Generation of continuation, Mechanical Engineering

Generation of Continuation

It is assumed that a partial schedule (which may be empty schedule) is given. For this partial schedule, a number of possible continuations is generated. In order to cope up with the combinatorial explosion, the continuation is based on a limited set of candidates for each station. This set is determined by priority rules.

 

Posted Date: 3/5/2013 8:08:58 AM | Location : United States







Related Discussions:- Generation of continuation, Assignment Help, Ask Question on Generation of continuation, Get Answer, Expert's Help, Generation of continuation Discussions

Write discussion on Generation of continuation
Your posts are moderated
Related Questions
temparature stresses in composite bars

CLASSIFIC A TIO N: (1 )  In accordance to Cylinder Axis: Engine can be vertical or horizontal. (2 )  In accordance to action of steam: Can be single acting or doub


V elocit y Ratio for Open Belt Drive: Figure Consider a simple belt drive (that is one driver and one follower) as shown in the figure given below Let D 1

Q. Show Maximum Allowable Working Pressure? The MAWP to be marked on the Section VIII nameplate is defined as the maximum gauge pressure permissible at the top of a completed v

Draw the shear force and bending moment diagrams for the beams shown in Figures 4 and 5. Also find the maximum shear force, bending moment and the points of contra-flexure

In designing piping systems, it is sometimes desirable to estimate the appropriate pipe length for a given diameter, pump power and flow rate. In such cases, if minor pipe losses a

3. How to illustrate the meaning of control system in control and automation system? 4. How to illustrate the major role of CPU in a PLC and what is the major role of CPU? 5. How

Describe vibration, How to calculate vibration?

#question.needs help to do my assignment.