Forecasting system outputs, Mechanical Engineering

Forecasting System Outputs:

In a company, inventory level is reviewed biweekly. If the parts used in an assembly have the lead time of one and a half week, what period should a forecast of requirements of parts cover for replenishment?

Solution

Forecast period = lead time + review period

= 1.5 weeks + 2 weeks

= 3.5 weeks

However, the replenishment of parts needs a forecast of requirements at least 3.5 weeks into the future.

Posted Date: 1/31/2013 6:30:57 AM | Location : United States







Related Discussions:- Forecasting system outputs, Assignment Help, Ask Question on Forecasting system outputs, Get Answer, Expert's Help, Forecasting system outputs Discussions

Write discussion on Forecasting system outputs
Your posts are moderated
Related Questions
Q. Show Oil production? Bitumen emulsion from field enters into the CPF emulsion inlet header. Depending on the emulsion temperature it may be cooled through two series exchang

Moment of Force: Defin e Moment of Force? Describe moment center and moment arm. Also classify the moment. Sol.: It is turning effect produced by force, on the body, on wh

Information Phase: Step: To secure all and complete information and gather facts and from best sources.   Our project is selected based on the current problem face by the

Compute the force exerted by the tires on the road: An automobile of mass 1500 kg traverses a 500 m curve at a constant speed of 50 kmph. Supposing no banking of the curve,

Components of power plant &it''s functions

Find out horizontal and vertical components of hinge force: The frame shown in Figure is supported by a hinge at E and a roller support at D. Find out horizontal and vertical

what is the essentials of a good boiler?

what are the significance and scope of operations research

Arc-Welding Processes Arc-welding includes those welding processes wherein heat required for welding is derived from an arc powered by electrical energy, may be AC of DC as s