Fire risk assessment process:

This is the main part of the FRA process.    Here we consider the risk, measure it against what we consider acceptable and, if we consider that the risk is too great, we make our recommendations for remedial actions that will reduce or eliminate the risk.

Our recommendations may be for preventative measures or may be for fire precautions

- i.e. those measures that will make the building safe even if there is a fire within it.

This element is about recording the findings and recording the remedial actions that are required to make the risk acceptable. It also mentions co-operating with others and training staff.

Finally, the process is not meant to be done once and then forgotten about.  It should be carried out regularly and reviewed every time that there are any changes to the building, the people in it, the contents in it or the processes that take place within it. The period between regular reviews varies according to the type of premises involved. In a low risk office the review might only be required every two or three years but in a high life risk shopping mall the review should be at least once per year.

 

 

Posted Date: 10/22/2012 6:01:34 AM | Location : United States







Related Discussions:- Fire risk assessment process, Assignment Help, Ask Question on Fire risk assessment process, Get Answer, Expert's Help, Fire risk assessment process Discussions

Write discussion on Fire risk assessment process
Your posts are moderated
Related Questions
Mode III Interlaminar Fracture Toughness  The Mode III interlaminar fracture toughness of a composite can be measured using the split cantilever beam (SCB) geometry. Here, a c

figure of amplitude shift keying & it''s explaination

Feathering the propeller: If there is an engine failure in flight, the propeller would windmill creating drag and increasing any damage that had occurred in the engine. Feathe

can i get block dig of digital frequency meter.

A methane-fired microturbine based on the regenerative gas turbine cycle employs a centrifugal compressor with a polytropic efficiency of 85%, a radial inflow turbine with a polyt

PEME5451/3451 SUSTAINABLE ENERGY PROCESSES Assignment 5: Transport fuels VLE submission deadline is Friday 24th February PART 1: (worth 40%, all parts marked equally) 1. Using the

Spinning Reticle Seekers  A spinning reticle seeker contains a single thermal detector and a spinning patterned disk - such as the ‘Rising Sun' Reticle.   - consis