Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
Explain the National Primary Drinking Water Standards
Safe Drinking Water Act (SDWA, 1974) required EPA to establish maximum contaminant levels (MCLs) for public water systems (any water supply facility (public or private) that provides water for human consumption and has at least 15 service connections or regularly serves at least 25 people daily at least 60 days in a year.
SDWA (amended in 1986) required EPA to set maximum contaminant level goals (MCLGs) and MCLs for 83 specific substances. MCL is the enforceable level that water supplier must not exceed and MCLGs is a goal that equal to the maximum contaminant level that is not expected to cause any adverse health effects over a lifetime of exposure. The typical contaminants found in water and the treatment methods used are listed in the table below. A typical treatment flow chart for surface water is shown also.
Absolute pressure is measured from a vacuum (0 PSI) and atmospheric pressure is14.7PSIa or 14.7 PSI above a vacuum 1PSI on a tire pressure gauge is known as 1PSIg = 15.7PSIa 10PSIg
define structure?
Classification of beam
Question Will it advantageous to use concrete of very high power for example exceeding 60MPa? What are potential problems connected with high strength concrete ? Answer To in
The footprint of a proposed office building is overlaid on the existing contours topographic map of a sloping site as shown in the figure. The structural bays which are 65-ft by 65
how to calculate loads acting on a simple supported beam of 220width by 425 depth #Minimum 100 words accepted#
describe setting out right angle at given point on a chain line and when the point lies outside the chain line
definition for double type scaffolding
A building was to be constructed on a clay stratum. Preliminary analysis showed a settlement of 60 mm in 6 years and an ultimate settlement of 250 mm. The average enhance of pressu
Types of Surveys and Investigations: For preparing a good road project, the following surveys and investigations are needed: (a) Traffic Surveys (b) Topogr
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd