Explain interim inspection - underwater inspection of bridge, Civil Engineering

Explain the Interim inspection - underwater inspection of bridge

An interim inspection is an inspection scheduled at the discretion of the engineer. An interim inspection is used to monitor a particular known or suspected deficiency e.g. foundation settlement or scour.

Posted Date: 6/12/2013 7:55:28 AM | Location : United States







Related Discussions:- Explain interim inspection - underwater inspection of bridge, Assignment Help, Ask Question on Explain interim inspection - underwater inspection of bridge, Get Answer, Expert's Help, Explain interim inspection - underwater inspection of bridge Discussions

Write discussion on Explain interim inspection - underwater inspection of bridge
Your posts are moderated
Related Questions
what will be the w/c ration and cement/fly ash ration for the particular mix design

how to calculate loads acting on a simple supported beam of 220width by 425 depth #Minimum 100 words accepted#

Demonstrate the economical design of concrete A safe, serviceable and economical design of concrete structures requires a comprehensive knowledge of the loads expected to be a

haw to control quality of constraction material and it''s stage of control, control management, quality of performance ,organization for control

sample problems with solutions for probable value

Compute the stresses at top and bottom fibers in a simply supported pre-stressed concrete beam with a rectangular cross section, 250 mm wide and 450 mm deep, as shown in Figure, at

Question What are the main drawbacks of curing by ponding and polythene sheets ? Answer Purpose of curing is to decrease the speed of heat loss of freshly placed concrete to atm

Q. Paint system to protect steelwork from corrosion? In a typical painting system, there are generally three main layers primer, undercoat and finishing coat. Primer acts as th

Q  A transition curve is required for a circular curve of 200-meter Φ radius, the gauge being 1.5 m. and max super elevation restricted to 15 cm. The transition restricted to 15 cm

If you have water pressure and wish to handle it, do not cause flow in the line, which will decrease pressure because of friction. To keep pressure up, decrease friction by increas