Explain build the pilot project and then make a decision, Operation Management

Assignment Help:

Dan Reid, chief engineer at New Hampshire Chemical, Inc., has to decide whether to build a new state-of-art processing facility. If the new facility works, the company y could realize a profit of $200,000. If it fails, New Hampshire Chemical could lose $150,000. At this time, Reid estimates a 60% chance that the new process will fail. The other option is to build a pilot plant and then decide whether to build a complete facility. The pilot plant would cost $10,000 to build. Reid estimates a fifty-fifty chance that the pilot plant will work. If the pilot plant works, there is a 90% probability that the complete plant, if it is built, will also work. If the pilot plant does not work, there is only a 20% chance that the complete project (if it is constructed) will work. Reid faces a dilemma. Should he build the plant? Should he build the pilot project and then make a decision? Help Reid by analyzing this problem.


Related Discussions:- Explain build the pilot project and then make a decision

Explain in what kind of ways did these mangers respond, In what kind of way...

In what kind of ways did these mangers respond to these challah for example in their approaches to planning leading organizing and controlling?

Generic operational strategies - operation strategy, Generic Operational St...

Generic Operational Strategies - Operation Strategy Porter (1985) presented five basic generic strategies for business:  1. Cost efficiency - low cost leadership strategy

Describe major options for appraisal of employees, What are the major optio...

What are the major options for appraisal of employees? Discuss each option, identifying the one that you think is "Best", and why you chose that option

Calculate the quarterly index, Over the past year, Meredith and Smunt Manuf...

Over the past year, Meredith and Smunt Manufacturing had annual sales of 10,000 portable water pumps. The average quarterly sales for the past 5 years have averaged: Spring 4,00

Determine the wbs shown below, Consider the WBS shown below: 1.00.00 1.1...

Consider the WBS shown below: 1.00.00 1.1.0 1.1.1 1.1.2 1.2.0 1.2.1 1.2.2 If the total program costs $100,000 and 1.2.1 and 1.2.2 are each $20 K, then the cost of 1.1.0 is:

Explain what is the annual cost for ordering item x, Item X is a standard i...

Item X is a standard item stocked in a company's inventory of component parts. Each year the firm, on a random basis, uses about 2,500 of item X, which costs $25 each. Storage cost

How performance based pay systems might be better designed, Is performance-...

Is performance-based pay effective? Why or why not? How performance based pay systems might be better designed to ensure optimal results

Explain expected return on the market, Assume that the risk-free rate is 7....

Assume that the risk-free rate is 7.0% and the expected return on the market is 8%. What is the required rate of return on a stock with a beta of 1.4? Round your answer to two deci

Illustrate the examples of the inventory control systems, Illustrate the ex...

Illustrate the examples of the inventory control systems? Examples of inventory control systems Reorder level systems: When the current stock level decreased below a

Describe what are the advantages of financing, In the %u201CWhat would you ...

In the %u201CWhat would you do?%u201D section of your text in Chapter 9, Pam Marrone of AgraQuest, Inc. tapped into Internet sources when she needed additional financing. Be specif

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd