Evacuation of a high rise building - means of escape, Other Engineering

Evacuation of a high rise building - means of escape:

Evacuation of a high rise building is likely to be split into two or more phases.  Initially, when the alarm activates (from a single device) there will be an investigation period when the building staff check the cause of the signal and when no evacuation signal is given.  If there is no fire then the system is reset and no one is disturbed.  If a fire is confirmed, then evacuation of the building starts.  Sometimes it is just the fire floor that evacuates initially, sometimes it is the fire floor and adjacent floors.   After the initial evacuation other floors in the building are evacuated, sometimes in pairs moving up the building or sometimes all together. This is referred to as phased evacuation.

 

 

Posted Date: 10/22/2012 7:18:29 AM | Location : United States







Related Discussions:- Evacuation of a high rise building - means of escape, Assignment Help, Ask Question on Evacuation of a high rise building - means of escape, Get Answer, Expert's Help, Evacuation of a high rise building - means of escape Discussions

Write discussion on Evacuation of a high rise building - means of escape
Your posts are moderated
Related Questions
Static electricity in aircraft: As mentioned earlier, the effects of static electricity are of considerable importance in the design of aircraft and aircraft equipment. An air

Hot Section Inspections (HSI's) The hot section includes all components in the combustion and turbine sections of the engine. Scheduled inspections may involve visual inspectio

the project those see in the matlab project which in the voice of different birds

10 vertical examples

Method of calculating the thrust forces: The thrust forces or gas loads can be calculated for the engine, or for any flow section of the engine, provided that the areas, pressu

what are the no-arbitrage lower bound of the vertical spread

Students are to undertake a tunnel blast design for the following conditions: • Tunnel is 5.5m wide by 5.5.m high • Rock is a granite with a UCS of 300 MPa • Drill hole diameter is

I need some help

Hello, I have a chemical engineering project and I need help.

2. Differentiate between stream oriented and data gram oriented socket in java?