Estimate the manufacturing cost for bearing housing, Cost Accounting

Estimate the manufacturing cost for a bearing housing following the Formula Student Costing Scheme.

 Dimensions and materials of the bearing housing will depend on your student number. Drawings and Solid works part files are provided online, adjust the designs to your specific dimensions.

 The Bearing housing assembly is composed by 4 components, plus fasteners:

 1.  Base of the pedestal

2.  Top of the pedestal

3.  Bearing (plain bearing for rapidly rotating shafts)

4.  Locking Pin (interference fitting with bearing, loose fitting with pedestal)

a. Two threaded studs (fasteners)

b. Two nuts (fasteners) 

If your Student number is ABCDEF:

565_Estimate the Manufacturing Cost for Bearing Housing.png

Use Solidworks databases for the definition of material properties (such as material densities) and for the selection of suitable fasteners (Design library\ Solidworks toolbox).

Posted Date: 3/7/2013 12:14:18 AM | Location : United States







Related Discussions:- Estimate the manufacturing cost for bearing housing, Assignment Help, Ask Question on Estimate the manufacturing cost for bearing housing, Get Answer, Expert's Help, Estimate the manufacturing cost for bearing housing Discussions

Write discussion on Estimate the manufacturing cost for bearing housing
Your posts are moderated
Related Questions
Understanding the existing capital requirements and how these are financed will assist us in understanding the process of financing of business and the flow of funds inside the bus

Banana Corporation had the following transactions relating to a patent: January 1, 2010: Purchased patent for $2,000,000. The patent had fifteen years remainnig although Banan

Component of Fixed Overheads Variance Fixed Overhead Expenditure Variance The fixed overhead expenditure variance is the dissimilarity between the actual fixed expend


The balance sheet and income statement for Bingle Ltd is presented to you as follows: Balance Sheet Extract as at 30 June 2012 with comparatives

You perform a travel cost study that looks at the relationship between the cost of visiting a lake (including costs of travel, value of time spent not working & any entry fees), it

Illustration of Overhead Variance Analysis Again for intentions of our demonstrations in overhead variance analysis, we will suppose the given basic data for company in the pr

You are required to conduct a detailed analysis of all the prime cost and overhead variances. You must create a fictitious company (and a fictitious cost object) which has at least

A machine originally had an estimated useful life of 5 years, but after 3 complete years, it was decided that the original estimate of useful life should have been 10 years. At tha

Material Costs - Cost Accumulation However 'Materials' refer to the tangible inputs into the procedure of producing useful output.  They might be indirect materials or direct