An activated sludge tank treats 1 MGD from the primary clarify and has an X of
2200 ppm SS. The water euent is 0.9 MGD. 1.0 MGD of the sludge is recycled back into the tank
and has an [SS] of 3980 ppm. The concentration of the BOD exiting the primary clarier is 200
ppm.
(a) What are Qw and Xw?
(b) What are Qc and Xc?
(c) What are Q1 and X1?
(d) What is Xe? (Answer = 24.4 ppm)
(e) Calculate the volume of the tank that will satisfy the following requirements:
(e-1) BOD loading < 35 lb BOD/1000 ft3day
(e-2) Sludge age > 5 days
(e-3) Aeration period > 4 hr
Posted Date: 4/1/2013 10:52:47 PM | Location : United States







Related Discussions:- Environmental Question, Assignment Help, Ask Question on Environmental Question, Get Answer, Expert's Help, Environmental Question Discussions

Write discussion on Environmental Question
Your posts are moderated
Related Questions
I need technical assistance. The project is incomplete. I need someone to proofread it. Do you have someone who know Plaxis, Slope/W and Flac?. Can you arrange a case study for Geo

What are the problems in under water concreting?

in plane table surveying which activity is done first whether centering or levelling?

Hi, i really need help to done my assignment i have done some part but in that case i need professional advice to finish my task. could you please let me know if you can help me. t

define of couple

Maintenance of Gravel Roads: The maintenance consists of : filling up of potholes/depressions with fresh gravel and compacting after light sprinkling with water. g


Example of Bars of Varying Cross Section: In the numerical example under consideration δ = 750 × 300/( π/4) × 200 2 × 60 +750 × 400/(π/4) × 135 2 × 60 + 750 × 200/(π/4)

Define the Influence line-beam shear?   1.  Replace point of interest with a link element of nominal length.  If the point of interest is a reaction, place a hinge at that poin

explain the principle of working from whole to part, as used in surveying