engineering economics, Civil Engineering

Ask quA contractor has both a 3-cy and a 5-cy shovel in the equipment fleet. Select the minimum size shovel that will excavate 450,000 bcy of common earth in a minimum of 120 working days of 10 hr each. The average height of excavation will be 18 ft, and the average angle of swing will be 80 degrees. The 3-cy shovel has a maximum digging height of 30 ft and the 5-cy machine;s maximum digging height is 34 ft. The efficiency factor will be a 50-min hour. Appropriate-size units can be used with either shovel. How many days will it require to complete the work? (5-cy machine, 105 days to complete
estion #Minimum 100 words accepted#
Posted Date: 7/11/2019 2:31:01 AM | Location : Ethiopia







Related Discussions:- engineering economics, Assignment Help, Ask Question on engineering economics, Get Answer, Expert's Help, engineering economics Discussions

Write discussion on engineering economics
Your posts are moderated
Related Questions
why strength of transition zone is less than bulk paste


This assessment will test Learning Outcomes 3 and 4 as well as the component of Learning Outcome 1 as it refers to waste disposal for the Plumbing Technology. The student is expect

briefly explain about c tokens ?

batching by volume

Explain about the Hydrogen Embrittlement As a result of the action of acids on high-tensile steels, liberation of hydrogen takes place. It penetrates into the steel surface an

Q. What is Raft Foundation? A raft or mat is combined footing that covers the entire area beneath a structure and supports all the walls and coloumn when the allowable soil pre

(a) Relate dissimilar formations of soils to the geological aspects. (b) Explain different types of texture and structure of soils. (c) Bring out the typical characteristics

Prestressed concrete poles In the past decades, prestressedĀ  concrete poles have become popular and have replaced the traditional poles made of timber, steel or reinforcedĀ  con

what is offset survey and how it is done