Energy conservation building codes, Electrical Engineering

Energy Conservation Building Codes

It encompass the norms and standards of energy consumption expressed in terms of per square meter of the area wherein energy is used.

The main provisions of the Act on Energy Conservation Building Codes are as given below:

  1. The BEE would prepare guidelines for Energy Conservation Building Codes (ECBC);
  2. ECBC would be remembered to suit local climate conditions or other compelling factors through the respective states for commercial buildings constructed after the rules relating to energy conservation building codes have been notified. Additionally, these buildings should have a linked load of 500 kW or contract demand of 600 kVA and above.
  3. Energy audit of specific designated commercial building consumers would also be prescribed. Through energy audit, we mean verification, monitoring and analysis of energy use involving submission of technical report containing recommendations for improving energy efficiency with cost advantages analysis and an action plan to decrease energy consumption.
Posted Date: 2/1/2013 12:22:19 AM | Location : United States







Related Discussions:- Energy conservation building codes, Assignment Help, Ask Question on Energy conservation building codes, Get Answer, Expert's Help, Energy conservation building codes Discussions

Write discussion on Energy conservation building codes
Your posts are moderated
Related Questions
Q. Explain Transfer of Risk? In case of this method, risk is transferred to some other person or organization. In other words, under this method, a person who is subject to ris

Explain the suitability of aluminium  that is used as electrical conducting materials. Aluminium : Conductors are appropriate for ambient and very high temperature. Use of alu

Uses of FET IGBTs (Insulated-gate bipolar transistor) see application in switching internal combustion engine ignition coils, in which fast switching and voltage blocking cap

A 150 km long, 3-phase, 400 kV overhead line is used to transmit 1800 MW to a distribution area at 0.9 power factor lagging. The line parameters per phase and per unit length in st

What is the difference between near call and far call? The PROC directive specifies the start of a procedure, should also be followed along with a NEAR or FAR. A NEAR procedure

Q. For the circuit shown in Figure, determine v out (t).

when i/p voltg is grater than battery diode is clse or open

Demodulators for FM Figure  shows a block diagram of a general FM demodulator, which is implemented by generating an AM signal whose amplitude is proportional to the instantane

Design combinational-sequential electronic logic gate circuit for a car wash....