i need help in my assignment it''s due few days

We have a reciprocating compressor operating at 800 rpm. Suction pressure and discharge pressure are held constant by other systems that have nothing to do with the compressor. W

Q. Stress analysis reporting? • Stress sketch with all node points, dimensions, pipe schedule, weights of non-standard components, e.g., control valves and actuators, insulatio

Q. Design Loading - Unloading Facilities in plant layout? Loading and unloading areas should be separated. These facilities should be situated on the edge of the site near road

Seawater is boiled in a 5 liter kettle to produce drinking water.  In class we solved the steady-state version of this problem.  Here you are asked to consider the transient period

Q. Design lay-down areas for plant? Designated lay-down areas are areas specifically positioned to enable equipment maintenance to be carried out. These are normally assigned f

How does an Ignition system works ?

Copper-Lead Alloys Copper-lead alloys, having a large percentage of lead have determined a considerable employ as bearing material lately. Straight, copper-lead alloys of such

By introducing their model of neural excitability in 1952, Alan Lloyd Hodgkin and Andrew Huxley not only shed light on the mechanism underlying a very important phenomenon in Physi

A large tower is to be supported by a series of steel wires; it is estimated that the load on each wire will be 13,300 N (3000 lb f ). Determine the minimum required wire diameter,