Drainage of the railway track - construction of railway line, Mechanical Engineering

Drainage of the Railway Track:

It is necessary to keep the embankment free from water. This is done by providing side ditches, all along the edge of the embankment, and leading the water to natural channels. In cuttings, side ditches are equally important. If seepage of water is expected uphill, it is preferable to provide intercepting drains or catchwater drains (Figure).

114_Drainage of the Railway Track.png

Figure : Drainage of Railway Track

Cross-drainage structures as discussed in Section 9.5 are constructed along with the earthwork.

Posted Date: 1/23/2013 1:20:32 AM | Location : United States







Related Discussions:- Drainage of the railway track - construction of railway line, Assignment Help, Ask Question on Drainage of the railway track - construction of railway line, Get Answer, Expert's Help, Drainage of the railway track - construction of railway line Discussions

Write discussion on Drainage of the railway track - construction of railway line
Your posts are moderated
Related Questions
ELECTRODE WIRE FOR CO2 WELDING CO 2 welding wire must have a special composition to withstand the oxidising nature of the CO 2 arc atmosphere. Though, CO 2 is not reactive a

Q. Show Pneumatic Test? Pneumatic testing presents hazards that must be addressed as part of the engineering design of the pressure vessel. Due to the additional hazards of

is there any other punch material for making cold forged nut except AISI M2

Evaluate the maximum bending stresses: A beam of I-section illustrated in Figure is simply supported over a span of 10 m. It carries an uniform load of 4 kN/m over the whole s

how to draw circuits using cascade

what is surging in turbo machines subject

Find out the forces in members: A braced support ABC is loaded as illustrated. Find out the forces in members AB, BC, BD and AD by the method of joints. Check out the results

Determine the maximum stress developed in the beam: An I section in Figure is utilized as a beam. The beam is subjected to a bending moment of 2.5 kN m at its neutral axis. De

The steam that leaves the super-heater is expanded from 130bar at 535°C to 25.2bar at 310°C in a high pressure turbine. The steam from the exit of the HP turbine is reheated to 535