Drainage of the railway track - construction of railway line, Mechanical Engineering

Drainage of the Railway Track:

It is necessary to keep the embankment free from water. This is done by providing side ditches, all along the edge of the embankment, and leading the water to natural channels. In cuttings, side ditches are equally important. If seepage of water is expected uphill, it is preferable to provide intercepting drains or catchwater drains (Figure).

114_Drainage of the Railway Track.png

Figure : Drainage of Railway Track

Cross-drainage structures as discussed in Section 9.5 are constructed along with the earthwork.

Posted Date: 1/23/2013 1:20:32 AM | Location : United States







Related Discussions:- Drainage of the railway track - construction of railway line, Assignment Help, Ask Question on Drainage of the railway track - construction of railway line, Get Answer, Expert's Help, Drainage of the railway track - construction of railway line Discussions

Write discussion on Drainage of the railway track - construction of railway line
Your posts are moderated
Related Questions
Find out change in diameter: A cylindrical shell, 0.8 m in a diameter and 3 m long is along with 10 mm wall thickness. If the shell is subjected into an internal pressure of 2

(a) Explain a typical fuel feed system for a C.I engine, differentiate between air injection system and solid injection system. (b) Why Gasoline injection system has been adopte

Compute the ratio of the torque: Compute the ratio of the torque transmitted by a hollow & a solid shaft of the similar material, length & weight. Solution d i = inte

Deflection at the centre: A simply supported beam of span 6 m is subjected to Udl of 24 kN/m for a length of 2 m from left support. Discover the deflection at the centre, maxi

Advantages and Limitations of Adhesive Bonding The description so far might be concluded through listing main advantages of adhesive joints. (a) The adhesive joints assist

Q. Define Pattern draft or taper? It is also termed as "draw". It is the taper placed on the pattern surface that are parallel to the direction in which the pattern is withdraw

Explain the Back Rake Angle It measured the downwards slope of the top surface of the tool from the nose to the rear along the longitudinal axis. Its purpose is to guide the di

Q. Describe the Slope - Area Method? In the event of infeasibility of Velocity Area method on account of either rapid rise or fall of floods or lack of equipment or any other r

Abrasive Machining Processes Such machining processes are precision machining processes. They generate work-piece surfaces along with a high degree of surface smoothness and d

I have selected Mining Industry and have selected three rival Mining Companies to conduct a preliminary analysis. I have done my bachelor's degree in Mechanical Engineering, I have