DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.

Posted Date: 2/6/2013 2:05:42 AM | Location : United States







Related Discussions:- Dpr preparation, Assignment Help, Ask Question on Dpr preparation, Get Answer, Expert's Help, Dpr preparation Discussions

Write discussion on Dpr preparation
Your posts are moderated
Related Questions
Q. Can you explain about Trapeziodal Clippers? During The Positive half cycle, the diode D1 will be open circuited and the input appears as the output until, the applied bias v

Q. Show Process of Power transmission and distribution? The structure of a power system can be divided into generation (G), transmission, (T), and distribution (D) facilities,

A selection form an application's menu, or a command typed in by the user, like at a DOS prompt or at the Run dialog box in Windows.

Circuit with inductive load  Electromagnetic induction When a conductor is moved across a magnetic field so as to cut by the lines of force (or flux, an electromotive force

Write a short explanation of the principles of super-heterodyne receiver. It may help to use sample block diagram to state the process. Why is the production of the intermediate fr

A 100-kW, 250-V shunt generator has an armature-circuit resistance of 0.05  and a field- circuit resistance of 60 . With the generator operating at rated voltage, determine the i

Consider the magnetic circuit of Figure with an air gap, while neglecting leakage flux. Correct for fringing by adding the length of the air gap l g = 0.1 mm to each of the other

please i need to prepare thesis proposal based on the title above. analysis of recently exixting algorithm and propose an improved one. UGENTLY!!

Describe the Automated flow lines with suitable diagrams? Also provide the Reason for Automating? Discuss the Work part Transfer Mechanisms in detail? Discuss the requirement fo

Q. Digital controller for a steam-turbine driven generator? Figure illustrates the basic elements of a minicomputer system in terms of a block diagram for speed and voltage con