DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.

Posted Date: 2/6/2013 2:05:42 AM | Location : United States







Related Discussions:- Dpr preparation, Assignment Help, Ask Question on Dpr preparation, Get Answer, Expert's Help, Dpr preparation Discussions

Write discussion on Dpr preparation
Your posts are moderated
Related Questions
Q. Commercial FM radio broadcasting? Commercial FM radio broadcasting utilizes the frequency band of 88 to 108 MHz for the transmission ofmusic and voice signals. The carrier


Q MCM is the abbreviation for 1 kcmil. problem for a de?nition of cmil.) Data for commercial-base aluminum electrical conductors list a 60-Hz resistance of 0.0880 /km at 75°C for

Q. Athree-phase, 600-kVA, 2300:230-V,Y-Ytrans- former bank has an iron loss of 4400 W and a full- load copper loss of 7600 W. Find the efficiency of the transformer for 70% full lo

Single Phase Half wave controlled Rectifier In half  wave  rectification either  the positive or negative half  of the ac wave is  passed while  the other  half is blocked. Be


what''s robust?

Gate terminal - field-effect transistor: The names of the terminals consider to their functions. The gate terminal might be thought of since controlling the opening and closin

a) Illustrate the Schematic diagram of the Transformer Box used in the Practical Session b)  Calculate the output voltage on an Oscilloscope and determine its amplitude and freq

State the Advantages of expert systems -  Never "forgets" to ask a question in determining the logic -  provides consistent answers - Less skilled work force needed, ther