Dpr preparation, Electrical Engineering

DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.

Posted Date: 2/6/2013 2:05:42 AM | Location : United States







Related Discussions:- Dpr preparation, Assignment Help, Ask Question on Dpr preparation, Get Answer, Expert's Help, Dpr preparation Discussions

Write discussion on Dpr preparation
Your posts are moderated
Related Questions
Serial Input output Ports For serial  input  and output  there are  two pins  in 8085 microprocessor

Hello, Please how do I compare performance of a digital modulation scheme with matlab?

Explain the Synchronous Up-Down Counters? The circuit of a 3-bit synchronous up-down counter and a table of its sequence are shown below.  Alike to an asynchronous up-down count

Geographic Information System: Geographic Information System (GIS) is a computer system capable of assembling, manipulating, storing, and displaying geographically referenced

Define the Signals in Time Domain? The time domain is the type of visualization that most people are familiar with. This method shows variations of a signal with time. The most


Q. Discuss the operation of a transistorized phase shift oscillator with the help of a diagram? Explain the phase shifting circuit? An oscillator is a circuit which converts elec

RST Restart Instructions Restart instructions  are one byte call instructions. Called location for each restart instruction is  predefined on page 0 ( read only memory). They

Q. The quantum levels of a quantizer are separated by the step size δv = 0.2 V, with the lowest and highest levels of-3.3 V and +3.3 V, respectively. A sequence ofmessage sample

If the stator windings of an alternator were to be supplied by an AC of frequency f (as opposed to drawing an AC current from them as would be the case for an alternator) then