Dpr preparation, Electrical Engineering

DPR PREPARATION:

1.  Asset Management

2.  System Operations and Despatch

3.  Field Operations

4.  Customer Processes

5.  Corporate Processes

The details covered under these sections and subsections are summarised in the subsequent tables. The headings under the first three subsections, viz., asset management, system operations and despatch and field operations remain the similar for the sections B to E and are listed in column 2 of Table.

Table: Content Coverage for Subsections 1 to 3 of Sections B to E in the DPR

 

B. UNDERSTANDING THE "AS-IS" CONDITION, C. GAP ANALYSIS

 

D. FINDINGS AND CONCLUSIONS and E. COSTS, BENEFITS AND RISKS

 

1. Asset Management

 

  • Upgrading the Distribution Network

 

  • HVDS Feeders 12 and 13

 

  • Network Refurbishment

 

  • Network Modernization

 

2. System Operations and

Despatch

 

  • Rural Load Management System
  • Load Research and Power Quality
  • Automatic Remote Monitoring of SAIDI, SAIFI, CAIDI, and Voltage

3. Field Operations

  • Modernization of Metering
  • Project Management
  • Safety Equipment

 

The details within each subsection headings could vary. The coverage in the remaining subsections 4 and 5 differs in the details for sections B to E and is given in Table.

Table: Content Coverage for Subsections 4 and 5 of Sections B to E in the DPR

 

 

 

 

B. UNDERSTANDING THE "AS-IS" CONDITION and C. GAP ANALYSIS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • New Connection Management
  • Meter Management
  • Meter Reading
  • Billing
  • Collection
  • Revenue Recovery and Revenue Discipline

 

5. Corporate Processes

 

  • Best Practices
  • KKPIs and KPIs
  • Training
  • Energy Audit and Revenue Protection
  • IT Services Management
  • Stores
  • Finance and Accounting
  • Procurement
  • Demand Side Management
  • Human Resources
  • Upgrading the Transmission Network

 

D. FINDINGS AND CONCLUSIONS and E. EVALUATION OF COSTS, BENEFITS AND RISKS

 

4. Customer Processes

 

  • Integrated Customer Care
  • Customer Installations Refurbishment
  • Customer Care
  • Extension of the Centralized Call Centre and IVRS
  • Prepaid Meters

 

5. Corporate Processes

 

  • Best Practices
  • KPIs and KKPIs
  • Training
  • Energy Audit and Revenue Protection
  • Enhanced EIS/MIS
  • Asset Management
  • Finance and Accounting
  • IT Infrastructure (Fast Track)
  • IT Disaster Recovery
  • IT Helpdesk
  • IT Asset Tracking
  • Tracking of Pilferage Cases
  • Upgrading the Transmission Network

Remember that the heads of information (Column 2) in the subsections on customer and corporate processes (Column 1) are the similar for Sections B, C and Sections D, E, respectively, in the above table.

Posted Date: 2/6/2013 2:05:42 AM | Location : United States







Related Discussions:- Dpr preparation, Assignment Help, Ask Question on Dpr preparation, Get Answer, Expert's Help, Dpr preparation Discussions

Write discussion on Dpr preparation
Your posts are moderated
Related Questions
PID controllers are popularly adopted in a wide range of industrial processes. The objective of this design practical is to study the way this PID controller changes system dynamic

hint on clamping as a project topic

What are the Advantages of using robots -  They are able to work non-stop; they don't need a break -  They are capable of working in conditions hazardous to humans -  Ess

Q. An integrator with positive voltage on a noninverting input is shown in Figure. Sketch v o for 60 ms after S has been opened.

Q. What do you mean by Source Encoding? After the quantization of message samples, the digital system will then code each quantized sample into a sequence of binary digits (bit

Give the properties and application of bronze. Bronze : It is alloy of copper and tin. This alloy is very brittle and hard. Its corrosion resistance is better than brass. Bron

Q. Explain about Zener Diodes? Most diodes are not intended to be operated in the reverse breakdown region. Diodes designed expressly to operate in the breakdown region are cal

Self-inductance and the induced e.m.f Inductance is the name given to the property of a circuit whereby there is an e.m.f induced into the circuit by alter of flux linkages pro

A single phase line has an impedance of 8.4 + j11.2 Ω. The line feeds a load consisting of a resistor and an inductor connected in parallel as shown in Figure 1. The load is absorb

Break over  voltage of Finger Voltage   The  minimum  forward voltage  when the gate  is opened  at which SCR  starts  conducting  heavily is called  the break over  voltage. To