Difference between von mises and maximum principal stress, Mechanical Engineering

What is the difference between von-mises and maximum principal stress?

What is axisymmetric, plane stress, and plane strain modeling?

What is difference between a beam, spar, shell, and solid element? Give a description on when you will use either elements?

Posted Date: 3/29/2013 6:04:08 AM | Location : United States







Related Discussions:- Difference between von mises and maximum principal stress, Assignment Help, Ask Question on Difference between von mises and maximum principal stress, Get Answer, Expert's Help, Difference between von mises and maximum principal stress Discussions

Write discussion on Difference between von mises and maximum principal stress
Your posts are moderated
Related Questions
V icke r ' s Hardness Test: This test is alike the Brinell test but uses different indenter. A square based pyramid of cone angle 136 ° is used. The applied load can be 5,

What is the aim of PDES The aim of PDES is to provide an interface which permits the exchange of data of the entire product development cycle and production cycle, see also PDE

Explain the Back Rake Angle It measured the downwards slope of the top surface of the tool from the nose to the rear along the longitudinal axis. Its purpose is to guide the di

1.Two machining operations, A (3 minutes per part) and B (10 minutes per part), are performed sequentially to manufacture a part. Machines A and B produce 5% and 6% defective items

Q. Illustrate types of pipe racks? The following types of pipe racks may be required: • Interconnecting pipe rack (elevated). • Unit pipe rack (elevated). • Pipe ra

Third Service and Fourth Service Prepare a list and explain the mandatory checks to be carried out during third and fourth service of a motorcycle.

Example of Process Capability The specifications for one characteristic of a part call for its width to be 3.000 + 0.008 centimetres. The procedure has been run under controll

what is the reason that rails are made in I-section form and not in the form of rectangular section.


PART A A new process plant for ore processing is currently being planned. The design is only in the first stage. However, three requirements have already been clearly stated: