Determine the value of the coefficient of permeability, Civil Engineering

Determine the value of the coefficient of permeability

A glass cylinder 5 cm internal diameter with a screen at the bottom is used as a falling head permeameter. The thickness of the sample is 10 cm. The water level in the tube at the begin of the test was 40 cm above tail water level and it dropped by 10 cm in one minute whereas the level of tail water remained unchanged. Verify the value of the coefficient of permeability.

 

Posted Date: 8/10/2013 4:05:41 AM | Location : United States







Related Discussions:- Determine the value of the coefficient of permeability, Assignment Help, Ask Question on Determine the value of the coefficient of permeability, Get Answer, Expert's Help, Determine the value of the coefficient of permeability Discussions

Write discussion on Determine the value of the coefficient of permeability
Your posts are moderated
Related Questions
I need technical assistance. The project is incomplete. I need someone to proofread it. Do you have someone who know Plaxis, Slope/W and Flac?. Can you arrange a case study for Geo

Determine the types of untensioned Reinforcement  Reinforcement used as untensioned steel should be one of the following types : (a)  Mild steel and medium tensile steel bar

With respect to implementation of Civil Engineering projects explain the relevance of application of the principle of ''Working from Whole to Part''

Dock Wall and Dry Dock: Dock Wall Figure gives the diagram of a dock wall. Figure: Mass Concrete Dock Wall Dry Dock Figure 9 gives the details

Sketches for English bond, Stretcher bond, Header bond, Flemish bond in first & second layer plan, elevation and 3 dimensional view of brick bond.

#question a pilot entering a bay on course 60.3 degrees at speed 12 miles per hour sees a light bearing 37.3 true and 20 minutes later he sees it bearing 20.0 degrees true. if he k

fabrication methods of ironmongery


Semi Dense Bituminous Concrete: Semi Dense Bituminous Concrete (SDBC) is similar to BC, but with a higher void content (5-10 per cent, as against 3-5 per cent in the case of

Assessing Maintenance Needs: Maintenance needs can be assessed by a careful inspection of roads at regular intervals, observing defects such as : potholes cracks