Design volume of the aeration basin - sewer construction, Civil Engineering

Design volume of the aeration basin - sewer construction:

Problem:

What is the design volume of the aeration basin?

Solution

Assuming that 30% of the plant influent BOD5 is removed during primary sedimentation, this means that So = 444 mg/l × 0.70 = 310 mg/l.

Qc = 1/t

Thus  1/Qc = [(Q0×Y)/(V×X)(S0 - S)] -kd

¼ = [days]=33.75×106 [-1/d]× 55/100[g/g]×(310[mg/l]-2 [mg/l])

V[l]×4300[mg/l]-0.05[1/day]

Solving for V, we get V = 5007558 l = 5,00,000 l.

Posted Date: 1/22/2013 6:30:55 AM | Location : United States







Related Discussions:- Design volume of the aeration basin - sewer construction, Assignment Help, Ask Question on Design volume of the aeration basin - sewer construction, Get Answer, Expert's Help, Design volume of the aeration basin - sewer construction Discussions

Write discussion on Design volume of the aeration basin - sewer construction
Your posts are moderated
Related Questions
High strength friction grip (HSFG) bolts vs. normal bolts HSFG bolts have the following benefits when compared with normal bolts: (i)  Performance of preloaded HSFG bolts u

construction detail of all types of flooring

Q. Show the Settlement due to Vibration? The foundation resting on cohesionless soil and subjected to vibrations will result in settlements of higher magnitude. In sandy soil

Facilities that discharge wastewater to a publicly owned treatment works? Facilities that discharge wastewater to a POTW (publicly owned treatment works) are known as subject t

types of truss of 15 m cantilever with 1000 kg on free end. May be steel or any lightest material aluminium anodized truss. thanks

the two sides of a triangle are 17cm and 28 cm long, and the length of the median drawn to the third side is equal to 19.5. find the distance from an endpoint of this median to the

state and prove Heisenberg uncertainity principle?

Define Inspection of Pier or Abutment? Inspection of pier/abutment may then be carried out as under: i. Conduct visual inspection of the entire surface using up and down swe

Question In General Specification for Civil Engineering Works, designing of roadbase material is based on recipe approach. Give reason. Answer Designing of roadbase