Design volume of the aeration basin - sewer construction, Civil Engineering

Design volume of the aeration basin - sewer construction:

Problem:

What is the design volume of the aeration basin?

Solution

Assuming that 30% of the plant influent BOD5 is removed during primary sedimentation, this means that So = 444 mg/l × 0.70 = 310 mg/l.

Qc = 1/t

Thus  1/Qc = [(Q0×Y)/(V×X)(S0 - S)] -kd

¼ = [days]=33.75×106 [-1/d]× 55/100[g/g]×(310[mg/l]-2 [mg/l])

V[l]×4300[mg/l]-0.05[1/day]

Solving for V, we get V = 5007558 l = 5,00,000 l.

Posted Date: 1/22/2013 6:30:55 AM | Location : United States







Related Discussions:- Design volume of the aeration basin - sewer construction, Assignment Help, Ask Question on Design volume of the aeration basin - sewer construction, Get Answer, Expert's Help, Design volume of the aeration basin - sewer construction Discussions

Write discussion on Design volume of the aeration basin - sewer construction
Your posts are moderated
Related Questions
Explain the Bernoulli Energy Equation Accounts for the fluid energy at any point in a fluid flow system. Units are in ft. Developed for energy without friction. The total energ

You have been selected to assist the structural engineer for a bridge replacement project.  Your task is to design the size of the footing for an interior bridge pier, based on the


State the Modulus of Elasticity of Concrete The Young's modulus of elasticity of concrete is primarily influenced by the elastic properties of the aggregate and to a lesser ex

• The transmission of load through a structure can be complex but in any particular case            - The applied load can usually be classified into 4 types                •

A  retaining wall, 4.5 m high, retains a soil with  c = 2 N/cm 2 ,  φ = 30° and g = 20 kN/m 3 , with horizontal surface level with the top of the wall. The backfill carries a surch

Define the Highlights of Critical Path Method A network analysis technique used to predict project duration by analyzing which sequence of activities has the least amount o

Differentiate between concrete and tendons In the case of pre-tensioned concrete members, the transfer of prestress takes place due to the bond between concrete and tendons. In

calculate height of instrument?

calculation of corrected fore bearings and back bearings in