Design of the aeration basin based on solids retention time, Civil Engineering

Design of the Aeration Basin Based on Solids Retention Time - sewer construction:

You are provided the following information about a municipal wastewater treatment plant. That plant will use the classically activated sludge process. Population = 150,000 people, flow rate of 33.75 × 106 l/day (equals 225 l/person/day) and influent BOD5 concentration of 444 mg/l (note this is high strength wastewater). Suppose that the regulatory agency enforces an effluent standard of BOD5 = 20 mg/l and suspended solids standard of 20 mg/l in the treated wastewater. A wastewater sample is collected from the biological reactor and is found to contain a suspended solids concentration of 4,300 mg/l. A suspended solids concentration within the secondary sludge is 15,000 mg/l and the concentration in the secondary sludge is 5,000 mg/l. The concentration of suspended solids in the plant influent is 200 mg/l and that which leaves the primary clarifier is 100 mg/l. A microorganism within the activated sludge procedure can convert 100 grams of BOD5 into 55 grams of biomass. They have a maximum growth rate of 0.1/day, a first-order death rate constant of 0.05/day, and they reach 1/2 of their maximum growth rate when the BOD5 concentration is 10 mg/l. The mean cell retention time of the solids is 4 days and sludge is processed on the belt filter press every 5 days.

Posted Date: 1/22/2013 6:29:46 AM | Location : United States







Related Discussions:- Design of the aeration basin based on solids retention time, Assignment Help, Ask Question on Design of the aeration basin based on solids retention time, Get Answer, Expert's Help, Design of the aeration basin based on solids retention time Discussions

Write discussion on Design of the aeration basin based on solids retention time
Your posts are moderated
Related Questions
calculate height of instrument?

The total equipment cost for an addition to a pharmaceutical plant is estimated to be $5,000,000. The percentages provided in the Table represent the average expenditures in other

Necessity of reinforcement in precast concrete manhole units Precast concrete manholes are generally constructed by placing the bases of manholes firstly. Walls of precast man

A retaining wall with a smooth vertical back retains a purely cohesive fill. Height of wall is 12 m. Unit weight of fill is 20 kN/m 3 . Cohesion is 1 N/cm 2 . What is the total act

1. 130,000-yd 3 of banked soil from a borrow pit is stockpiled before being trucked to the jobsite. The soil has 18% swell and shrinkage of 8%.  The final volume of the compacted


WHAT IS FLYBBACK LEVELLING


Construction of Embankment: The following steps describe embankment construction : (a) The ground is cleared and grubbed and all vegetation, grass, roots, etc. are removed

definition,old&new modern&difference