Design loading - unloading facilities in plant layout, Mechanical Engineering

Assignment Help:

Q. Design Loading - Unloading Facilities in plant layout?

Loading and unloading areas should be separated. These facilities should be situated on the edge of the site near road entrances, rail spur or docks. It is usual for loading bays to be close to storage areas to facilitate control and metering. The outdoor loading or unloading of chemicals or powders should be kept away from, and downwind of personnel and the administration building. Frequent movement of trucks handling dangerous or waste materials should be routed away from the main personnel and process areas.

Loading and unloading facilities handling flammable commodities shall be kept a maximum distance from process equipment and from storage compounds.

Road loading bays should be placed parallel to each other, permitting simultaneous loading on each side of an island. Traffic flow should be through the bays to avoid the need for reversing and cross flow.

Weighbridge layout (single or dual) needs consideration to ensure the easy passage of trucks in and out of the plant. Adequate off road parking should be provided.

Jetties need to be designed for ships of different movements and sizes. LPG berths should be sited away from other facilities.


Related Discussions:- Design loading - unloading facilities in plant layout

Classification based on mode of welding, Classification Based on Mode of We...

Classification Based on Mode of Welding Manual welding: In this welding the entire welding operation is performed and controlled by hand. Here, there are two movements involv

Determine the air standard efficiency, Compare the efficiency of Diesel, ot...

Compare the efficiency of Diesel, otto and Dual combustion cycle on the basis of same compression ratio and same heat input. In an otto cycle air at 17 o c and 1 bar is compressed

Capp for machining process, CAPP for Machining Process This explained ...

CAPP for Machining Process This explained mainly two different approaches to Computer Aided Process Planning, i.e.  (a) Variant approach, and  (b) Generative approach.

Aggregate production planning, Aggregate Production Planning: This uni...

Aggregate Production Planning: This unit provides the definition and physical significance of aggregate production planning. Further, this is illustrated that how the internal

Inertia force analysis, what is the role of a correction couple and how doe...

what is the role of a correction couple and how does it come into picture in dynamically equivalent system?

Pumps, three indications of centrifugal pump cavitating

three indications of centrifugal pump cavitating

Mp, one point cutting tool

one point cutting tool

Determine the component of force , Determine the component of force: ...

Determine the component of force: The force of 500N is acting at a point subtends an angle of 60° with the horizontal. Determine the component of force along X and Y dire

Evaluate the gyroscopic couple, The turbine rotor of a ship having a mass o...

The turbine rotor of a ship having a mass of 200Kg moves at 200 r.p.m and its radius of gyration is 0.30 m. If the rotation of the rotor is clockwise looking from the aft., evaluat

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd