Design and implement company network infrastructure, Project Management

Network Infrastructure: This project will require replacement of major networking components throughout the office. Virtualization will result in increased speed and reliability for employees.

Current business needs revolve around making our company more efficient. Efficiency is currently held back due to aging and obsolete network components. These issues are highlighted by specific problems employees are experiencing such as slow network connections, spotty wi fi coverage within office building, and the fact that the current server has reached maximum capacity, no longer allowing any further users to authenticate with it.

Opportunities with this project are summarized by increased efficiency for employees which will result in greater productivity. These upgrades, if met with a successful implementation plan should translate to increased satisfaction with our customer base and the capacity to add to that base, making the company more profitable in the long run.

Details of the proposed infrastructure upgrade are as follows. Changing of the current backbone wiring to fibre optic cable will improve data transfer speed capabilities. Replacing hubs with switches will allow each individual network card to transmit data simultaneously rather than waiting its turn. Improving wi-fi coverage through the use of higher spec routers will increase the coverage and significantly reduce the likelihood of dropped connections. By upgrading the current servers we will expand the capacity of our network, allowing more users to authenticate.

Problems:
Issues with implementing this project include the downtime endured while the network is upgraded. When the components are being replaced the communications within the company will be significantly hindered. Therefore it is imperative that we have backup systems in place so that we can still utilize effective communications.

Project Objective:
Design and implement a company-wide, $100,000.00 network infrastructure upgrade to increase company performance and revenue, to be completed by April 1st, 2012.

Project Milestones:
• Define requirements
• Retrieve resources
• Set up backup network
• Cable new network with devices
• Configure devices
• Maintain network for each succeeding year

Main Project Success Criteria:
• Employees and customers can effectively utilize all network functions without any limitations.
• There is almost no network downtime

Posted Date: 3/26/2013 7:06:24 AM | Location : United States







Related Discussions:- Design and implement company network infrastructure, Assignment Help, Ask Question on Design and implement company network infrastructure, Get Answer, Expert's Help, Design and implement company network infrastructure Discussions

Write discussion on Design and implement company network infrastructure
Your posts are moderated
Related Questions
Solve the following CPM/PERT Network Analysis problem: Given the following network and activity time estimates, determine (ES, LS, EF, LF) earliest and latest activity times, slac

Product/Service and Volume Flexibility Ability to respond fast to the customer's needs known as flexibility.Two forms of flexibility are product/ Service and volume flexibilit

Assignment #2 . Assignment #2 You will need to first develop a customer''s Request for Proposal (RFP), then go to the simplified Project Proposal on pages 76-78 of your text a

#question.what is project planning.

Products liability law controls the private litigation of products accidents which provides compensation to the injured party. Products liability law involves the tort law of negli

Question 1: (a) While managing HR projects, explain the different stages that ultimately lead to ‘crisis' in a conflict situation. (b) Despite that fact that conflicts bre

Describe the incremental approach to orderly acceptance testing. Acceptance test: The users are invited to perform an acceptance test to check which what they have asked

Problem 1: Is closing of a clinical trial as important as initiation? Justify your answer with suitable examples. Difference between closing of a clinical trial and initi

Linear Programming Methods of Line Balancing Assume that a job is broken down into elements tasks and the total duration of all such tasks is 28 minutes. The cycle time i, e,

Risk Knowledgebase and Metadata  When we think of storing risk experience knowledge for our future use in the organisation and make it accessible is to build an automated repos