Demand side management, Electrical Engineering

Demand Side Management

Demand side management refers to programmes implemented through utilities to modify consumer load profile. Energy efficiency programmes decrease energy use both during peak and off peak periods, classically without affecting the quality of service given. Peak load reduction includes interruptible load tariffs, time of use rates, direct load control and other load management programmes.

Load shape flexibility could be achieved through programmes that modify price, cycle equipment, or interruption service in response to specific modifications in power cost or resource availability. These approaches involved real time pricing and time of use rates for pricing periods in which have flexible hours. Load building programmes are designed to increase use of high effectiveness electrical equipment or shift electricity consumption to off peak from peak hours thereby raising total electricity sales.

Posted Date: 2/6/2013 6:31:40 AM | Location : United States







Related Discussions:- Demand side management, Assignment Help, Ask Question on Demand side management, Get Answer, Expert's Help, Demand side management Discussions

Write discussion on Demand side management
Your posts are moderated
Related Questions
What is Permeability? Permeability: This is defined as the ability of the material to conduct flux. This is defined as the ratio of magnetic flux 'B' in a medium to the magneti

design single phase distribution circuit from a supply point to a load

Explain Memory Mapped I/O Scheme. Memory Mapped I/O Scheme: In such scheme there is only one address space. These address space is defined as all possible addresses which m

Q. An operational amplifier stage is typically represented by the circuit of Figure. For the values given, determine V out and the power supplied by the 2.5-V source.

Q. Explain various functions of telephone switching systems. Ans: Functions of telephone switching systems are: (i)  Attending: The system should be continually monito

The Ward-Leonard system, which is used in the control of large dc motors employed in rolling mills, is a highly flexible arrangement for effecting position and speed control of a s

Sing Flag If D7  ( bit left  most bit)  of accumulator  (which  some  exceptions) is 1 as a result  of any  arithmetical  or logical operations sign flag  is set ( bit  corresp

Measures of regulator quality: The output voltage can just be held roughly constant; the regulation is fixed by two measurements: 1. Load regulation is the alteration in ou

what is difference between dual trace and dual beam cro?

what is finger voltage?