Define the term - Clamp splice
In a Clamp splice, bolts and nuts alongwith clamp plates are used. Tendons are held in-between the clamp plates and these clamp plates are tightened with the help of bolts and nuts, as shown in Figure There is a considerable reduction in the tensile strength of tendons (say, utpo 50%) due to the use of this splice. This is why, the use of this type of splice is recommended in locations where the prestressing force may be sufficiently reduced, e.g. due to the curvature of tendons.
State the Design process of Prestressed Concrete Most of the times, the design process is an interactive and trial procedure in which the cycle of analysis - design - analysis
Define the Impact Damage - underwater inspection of bridge? Impact from moving vessels or logs carried during the floods can inflict damage to the structure. The impact or coll
Question What are the key problems if use pumping for concreting works ? Answer In pumping operation , force exerted by pumps have to overcome friction involving concrete an
maintenance of wbm roadstion
length of the line measured with 20m chain found to be 250m.calculate true length if the chain was 10cm long
Product Layout: Imagine a factory manufactures taps, drills, reamers and cutters. The production of each of these items needs different machines which may be placed in differe
Define Investigation Scour for Underwater Inspection of Bridge? Investigation Scour is probably the most critical item to be aware of when performing an underwater inspection o
A concrete contractor historical records show that the construction duration for a cast-in-place foundation formwork is 1,000-SF/crew-day. Determine the number of days a 200,000-SF
Question During piling works, normally founding levels of bored piles are definite by using total core recovery or rock quality designation (RQD). Are there any problems by
Enumerate the Variation in tendon stress In post-tensioned construction, several tendons are simultaneously stretched and anchored at the ends. It is assumed that all tendons
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd