Define steel substructure - underwater inspection of bridge, Civil Engineering

Define Steel substructure - underwater inspection of bridge?

Steel is used as a structural material and as external protective cladding on concrete foundation elements. Steel foundation elements located in water, commonly H piles, or sheet piling can suffer distress in the form of corrosion. The corrosion can be especially severe when the bridge is located in salt water or brackish water. The most important factors influencing and providing corrosion are the presence of oxygen, moisture, chemicals, pollution, stray electrical currents, and water velocities.

Posted Date: 6/12/2013 7:14:28 AM | Location : United States







Related Discussions:- Define steel substructure - underwater inspection of bridge, Assignment Help, Ask Question on Define steel substructure - underwater inspection of bridge, Get Answer, Expert's Help, Define steel substructure - underwater inspection of bridge Discussions

Write discussion on Define steel substructure - underwater inspection of bridge
Your posts are moderated
Related Questions
Define Recommendations for confined elastomeric pad?  (a) Permissible limits for confined pressure on elastomer pad depends upon effectiveness of internal seal preventing it fr

i require a workquestion #Minimum 100 words accepted#

Q. Core-barrel samplers: single tube sampler vs. double tube sampler vs. triple tube sampler Core barrel samplers are initially designed to sample rock. In single tube sampler

#question.A strain gauge arrangement is used to measure the applied force of a comnplex shaped civil engineering structure. Theoretical analysis have been round the relationship be

Question Why Poly tetra fluoro ethylene (PTFE) is usually used in sliding bearings? Answer The choice of sliding surface of bearings is of very important importance sinc

A 160-HP Diesel engine (peak fuel consumption = 0.04-gal/HP-hr) hydraulic excavator operates on a cycle time of 20 seconds during a 50-min/hr.  During the filling of the bucket cyc

The maximum dry density and optimum moisture content of a soil from standard proctor's test are 18 kN/m 3 and 16% respectively. Compute the degree of saturation of the sample,

Construction: Construction is usually done by one of the three methods: (a) Manual method, providing steel or wooden forms, pouring concrete and compacting by means of nee

who to we calculate the RL at first point.

what is a bolder?