Define p-n junction , Physics

when p type and n type semiconductor are joined or connected it is called p-n junction...in p-n junction the holes from p-type diffuse to n-type and vice versa....an finally a depletion layer is formed at the junction..the junction has small p.d. called barier potential..but due to small length of depletion layer the field is very high.

Posted Date: 3/12/2013 12:53:07 AM | Location : United States







Related Discussions:- Define p-n junction , Assignment Help, Ask Question on Define p-n junction , Get Answer, Expert's Help, Define p-n junction Discussions

Write discussion on Define p-n junction
Your posts are moderated
Related Questions
A)   Wirte two materials that are magnetic and two that are non-magnetic? B)  Explain magnetic induction C)  Describe what is meant by "Magnetomotive" force?

Second; s: The basic SI unit of time, explained as the period of time equal to the duration of 9 192 631 770 periods of the radiation equivalent to the transition among two hy

what is the motion of an oscillating column in a u-tube?

The weightless truss shown below supports loads at point A & B and is fastened to the supports at C & E.  The value of F1 in kN is given in P13 and the value of F2 in kN is given i

In an experiment of Quink tube source freequence 100 Hz is used to find 2nd maxima to 4th manima movalbe part of tube displaced by 1cm then calculate speed of sound in air

A long solenoid is fabricated by closely winding a wire of radius 0.5 mm over a cylindrical nonmagnetic frame so that the successive turns nearly touch every other. What would be t

Determine the external reactions on the x- and y-directions needed to hold the fixed vane, which turns the free oil jet in a horizontal plane. V1 = 18 m/s, V2 = 17 m/s, and Q = 0.1

how are particel interaction represented

Melting point: 525 0 C. It has small band gap and very high mobility around 70,000Cm 2 /V-Sec. It has much easier to prepare in single crystal from the Gallium arsenide. It is

The project consists of a word processed (typed) report submitted by the project report due date. Late submissions are penalized 10% of the mark per day, including Saturdays and Su