Deck that you can park a car under, Civil Engineering

Assignment Help:
I wish to build a deck that is 4.7m wide and 7m long alongside my house. I need to park a car under it so there can be no supports in the middle. Attached to the wall on one side and steel post on the other. I need specs.

Related Discussions:- Deck that you can park a car under

Sign convention, i am very confuge in sign convention of bending moment,rea...

i am very confuge in sign convention of bending moment,reaction and shear force in moment distribution method so give any suitable anwer with couple?

Define ways of providing the anti slip device - by bolting, Define Ways of ...

Define Ways of providing the anti slip device - By Bolting? The elastomeric bearing can be vulcanised with a stainless steel outer plate. The stainless steel plate is provided

Total volume of soil that excavated from the borrow area, Project specifica...

Project specifications require a relative compaction of 95% (modified Proctor).  Construction of a highway embankment requires 10,000-yd 3 of fill.  The borrow soil has an in-situ

#survey, Ask question #chaining and rangingMinimum 100 words accepted#

Ask question #chaining and rangingMinimum 100 words accepted#

Mr Kamal Saxena, What is WBM road. How it is constructed?

What is WBM road. How it is constructed?

Surveying, Distance ABC was measured with a 30m. Chain tested and found to ...

Distance ABC was measured with a 30m. Chain tested and found to be correct in the beginning of the work .after measuring AB=1.2 km chain was found to be 10 cm. To long chaining was

Test on specially moulded test piece, Test on specially moulded test piece ...

Test on specially moulded test piece The test piece shall be moulded by the manufacturer with identical compound and under identical vulcanizing conditions as used in manufact

Verify the void ratio and water content, Derive the relation among void rat...

Derive the relation among void ratio (e), specific gravity of particles (G) and moisture content at full saturation (w). A certain sample of saturated soil in a container weighs

Amount of water that added to achieve the optimum moisture, Geotechnical pr...

Geotechnical project specifications require that the soil's optimum moisture content of 24% be maintained during the roadbed's construction.   The field moisture test finds that fi

State the loss of prestress, State the Loss of prestress Loss of prestr...

State the Loss of prestress Loss of prestress due to elastic shortening definitely occurs in pre-tensioned concrete members. But in post-tensioned members it does not occur if

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd