Damage limits and repair in cold section inspection , Other Engineering

Damage Limits and Repair

Minor damage to compressor and fan blades may be repaired provided the damage is within the allowable limits established by the manufacturer in the AMM. Typical limits for fan blades are shown in Figure. All repairs must be well blended so that the finished surfaces are smooth.

The majority of cold section inspections will require the use of a strong light source and sometimes a small mirror. If however doubt exists as regard the extent of damage, then a boroscope inspection would be instigated. Always observe the safety precautions associated with working in the intake. Ensure that the flightdeck is suitably placarded informing other personnel that you are in the intake. Tripping of C/Bs may be required by the manufacturer in order to isolate the starting and ignition circuits. A safety man may be required who's job it will be to look after your interest.

 

705_Damage Limits and Repair in cold section inspection.png

Posted Date: 9/12/2012 8:55:23 AM | Location : United States







Related Discussions:- Damage limits and repair in cold section inspection , Assignment Help, Ask Question on Damage limits and repair in cold section inspection , Get Answer, Expert's Help, Damage limits and repair in cold section inspection Discussions

Write discussion on Damage limits and repair in cold section inspection
Your posts are moderated
Related Questions
Mergers Acquisition Mergers and acquisitions involve complex accounting treatment a merger, defined as amalgamation in India, involves the absorption of the target company by the

Synchro resolvers for low load: Both transmitter and receiver rotors are energised by the same AC supply and will induce equal and opposing voltages in the stator coils provide

Why low carbon steel can not be quench hardened?


Question: (a) What are the criteria that a frequency planner and a network engineer need to consider during cellular planning and design. (b) Assuming that you work as a c

Enumerate possible impact of having inadequate system design in the lead time and engineering cost?

Assume that a movie is two hours long, that the frame rate is 30 frames per second, and that the resolution per frame is 1080i (1920×1080 pixels per frame), and that each pixel is

a web application using any technology that accepts an email address and checks if the domain of the email address exists.

FOUR STROKE DIESEL ENGINE: T he cycle of events that takes place in a four -stroke diesel engine has been shown. Unlike the petrol which drawn in a mixture of air and petrol,