Cost and profitability - proposed kpis, Electrical Engineering

Cost and Profitability - Proposed KPIs

 KPI

 UOM

 Measures 

 RepresentativeStandards

 Aggregate Technical &  Commercial Losses   

 %

 Energy Realized / Energy Import

 8%

 End to end Money Flow Efficiency

 %

 Collection Deposited In Bank /Energy Delivered to the Division

 92%

 ROCE - Return on capital employed 

 %

 (Profit before Interest & Tax ) /(Long term loan + Equity)

 16%

 O&M Expenses per unit of energy Input 

 Paisa per unit

 Total O & M expenses /Total energy imported

 10 paisa per unit

 

Posted Date: 2/6/2013 1:36:43 AM | Location : United States







Related Discussions:- Cost and profitability - proposed kpis, Assignment Help, Ask Question on Cost and profitability - proposed kpis, Get Answer, Expert's Help, Cost and profitability - proposed kpis Discussions

Write discussion on Cost and profitability - proposed kpis
Your posts are moderated
Related Questions
Explain Eddy currents. Eddy currents: Magnetic materials placed as in alternating magnetic fields have eddy currents also induced in them. It is because the material is subject

how double diffraction occur at the surface

Describe in brief how email system works Following is a simple description of how email system works: -  Sender composes a message (and attaches a file if required) and send

This problem is with circuits. It is basic circuit problem. I need a very detailed step by step on how we arrived at the solutions. Only respond if you are 100% sure on your answer

Q. Residential wiring and safety considerations? Residential electric power service commonly consists of a three-wire ac system supplied by the local power company. A distribut

Q. Basic Characteristics and Operation of MOSFET ? In Figure the gate-to-source voltage is set to zero volts by the direct connection from one terminal to the other, and a volt

NAND Gate NAND   means NOT AND  it complements  the output  of an AND  gate. The symbol  of NAND  by a NOT  gate.  Generally Not  operation  is represented by a bubble as shown

Explain Synchronisation and Parallel Operation Generation, transmission and distribution of electric power have to be conducted in an efficient and reliable way at a reasonable

Explain different stage in energy audit?

Tardy Billing and Poor Revenue Collection Prolonged disputes, connivance, lack of consumer friendly policies, incorrect identification of category, fictitious billing (of non-