Construction of Passenger Terminal Building:

There are various concepts in planning and constructing passenger terminal buildings. These are :

(a)        The international and domestic traffic is segregated in separate buildings, or they are housed in one building with clear separation.

(b)       The arrival and departure are handled at ground level and passengers either walk to the aircraft or are transported in buses and use stairs.

(c)        The arrival and departure are handled at two levels. Passengers use aerobridges to board or alight from aircraft.

The terminal building should be functional in design, with no conflict of movement.

Posted Date: 1/23/2013 1:44:09 AM | Location : United States







Related Discussions:- Construction of passenger terminal building, Assignment Help, Ask Question on Construction of passenger terminal building, Get Answer, Expert's Help, Construction of passenger terminal building Discussions

Write discussion on Construction of passenger terminal building
Your posts are moderated
Related Questions
Q. Illustrate Concept of filter design? The material used for filter should satisfy the following normal criteria a. Filter material is more pervious than the base material

What will be the structural weight per meter for IRC class 70r bridge


Question Design of concrete structures, normally most aggregate sizes are adopted with scopes from 10mm to 20mm. Does an increase of most aggregate size advantage structures ?

Determine the horizontal abutment reaction of a rectangular portal frame under increasing central concentrated load

Explain Flow Measurement with Weirs Fixed plates positioned vertically in an open channel over which flow is directed through an opening. The opening linear distance is termed

Vertical Gradient: Vertical gradient can be of three types: Ruling Gradient Used as a matter of course. Limiting Gradient Used in situations where site condit

I want to ask about mathcad prime 2.0, when I want to save my work it shows that I can''t save it because Excel is busy ,, what I have to do to fix this problem ??

What is exogenous tree?

Tests on Bitumen: The following tests are conducted on bitumen to find its suitability as a road binder : (a) Penetration test (b) Softening Point test (c) Flash Poi