Construction of passenger terminal building, Civil Engineering

Construction of Passenger Terminal Building:

There are various concepts in planning and constructing passenger terminal buildings. These are :

(a)        The international and domestic traffic is segregated in separate buildings, or they are housed in one building with clear separation.

(b)       The arrival and departure are handled at ground level and passengers either walk to the aircraft or are transported in buses and use stairs.

(c)        The arrival and departure are handled at two levels. Passengers use aerobridges to board or alight from aircraft.

The terminal building should be functional in design, with no conflict of movement.

Posted Date: 1/23/2013 1:44:09 AM | Location : United States







Related Discussions:- Construction of passenger terminal building, Assignment Help, Ask Question on Construction of passenger terminal building, Get Answer, Expert's Help, Construction of passenger terminal building Discussions

Write discussion on Construction of passenger terminal building
Your posts are moderated
Related Questions
I need to find support reactions at O for the beam with a distributed load, a 6 kN moment couple at A and a 3 kN axial load as shown in picture.

Loss of prestress due to elastic shortening At the transfer of prestress, tensile stresses of tendons are transferred to concretc in the form of compressive stresses. Due to t

One pump lifts storm water from a storage tunnel wet well a constant vertical distance of 150 ft. The equivalent length Le of the 14 in diameter piping is 1,000 ft. Pressure drop d

Phases are usually identifiable because of adifference in density which causes gravitational separation. e.g. Ice floats on water, steam rises.

Explain Flocculation Most important factor effecting particle removal efficiency objective - to bring particles into contact so that they will collide, stick together

Q. Diffrence between Single and double-cell box culvert? The usage of double-cell box culverts is preferred to single-cell box culverts for cross-sectional area larger than abo

what are the step by step process of designing steel long span trusses?

a light rod ad

Q If the degree of curve is defined by the angle at the center subtended by an arc (or chord) 20 meters, find the length of the chord in meters so that the versine measured in cm

plz tell me the ratio of sand,aggregate,and asphalt.pl tell me the mm of aggregate