CONSTRUCTION FEATURES:

Comprises of a water drum which is connected to two headers at the front and back ends. The headers are connected by large number of water tubes which is inclined upwards from down take header to uptake header. Furthermore, a mud drum, in which heavier sediments of water settle down and are blown off from the blow off pipe, is provided. The combustion chamber is located below the boiler drum. A chain grate with the stoker is provided from burning coal. Hot flue gasses which are produced after combustion of fuel are made to pass over the water tubes in several passes with the help of baffles. The draught is regulated using dampers provided. Lastly, chimney is provided to permit exit of waste flue gasses.

A super heater is provided to superheat dry and saturated steam. It comprises of U tubes and is placed in path of flue gasses.

A number of mountings which ensure safe and efficient operation of boiler are also provided. These include water level indicator, Dead weight safety valve, Pressure Gauge etc.

 

 

Posted Date: 10/20/2012 2:48:16 AM | Location : United States







Related Discussions:- Construction of boiler, Assignment Help, Ask Question on Construction of boiler, Get Answer, Expert's Help, Construction of boiler Discussions

Write discussion on Construction of boiler
Your posts are moderated
Related Questions
A system consisting of 2kg of R-134a undergoes a cycle composed of the following processes: Process 1-2: constant volume from P1= 10 bar, x1=0.6 to saturated vapor. process 2-3 con

comment on types of air blast chiller (not freezer)


Q. Design Equipment Rooms for plant? Equipment for important safety systems and controls shall be located such that they can remain operational during the defined accidental ev

Argon - Hydrogen Mixtures Argon - hydrogen mixtures are employed in special cases, such as mechanised welding of light gauge stainless steel tubing, in which the hydrogen do





Determine the Excavation of soil Excavation of soil in open well foundations is done  by dredging with grab buckets or similar equipment. The volume of excavated soil always e