Effective stress parameters of a soil sample are able to be obtained from both consolidated undrained analysis and consolidated drained analysis. Though, consolidated undrained analysis is usually selected because of following reasons-

(i) Time occupied for consolidated undrained test is shorter than that of consolidated drained test. It is as consolidated drained analysis requires full dissipation of excess pore water pressure of soil throughout testing and it takes long time at what time soils of low permeability are experienced.

(ii) Useful information be capable of be obtained from stress path of consolidated undrained test.

(iii)Failure happens in worse stress level while compared with consolidated drained test.

 

Posted Date: 12/7/2013 5:50:22 AM | Location : United States







Related Discussions:- Consolidated undrained or consolidated drained analysis, Assignment Help, Ask Question on Consolidated undrained or consolidated drained analysis, Get Answer, Expert's Help, Consolidated undrained or consolidated drained analysis Discussions

Write discussion on Consolidated undrained or consolidated drained analysis
Your posts are moderated
Related Questions
Q. For what capacity would you design a sanitary branch sewer to serve a section having a population of 12500 persons with a rate of supply of 135 Liters. Ans.- Average flow

Need this assignment due in 10 hours


Describe the features of physical survey phase The Physical Survey (field and laboratory test) for the purpose of determination of physical and engineering properties of the ma

Three mechanisms: 1) Conduction - occurs in solids and stationary fluids (liquids or gases). 2) Convection - occurs in fluids. Change in the buoyancy of the fluid due to its


Traffic Surveys: The following traffic surveys are needed for preparing a good road project: Classified Volume Counts This survey is normally carried out for 7 days,

Q. Velocity distribution and flow formulae? Variation in velocity along a vertical in channel cross section is known to follow logarithmic distribution, maximum velocity being

Basic things used in road construction: Water Absorption : The quantity of water absorbed by aggregates. Aggregate Impact Value : The percentage by weight of crushed ma

In engineering, the code-allowable withdrawal force is zero, due to the wood expands and contracts over time and the nail pullout force can decrease to zero