Connection of shunt capacitors at 11 kv substation, Electrical Engineering

Connection of Shunt Capacitors at 11 kV Substations

11 kV automatic switched capacitor banks are installed on bus of 33 or 66 kV substations. This has the facility that the required number of capacitor banks could be put in or out of the service depending on the requirement.

The maintenance of voltage at customer premises inside statutory limits at all loads is the responsibility of utility. Series capacitors begin negative reactance within the line and improve the voltage that in turn also decreases the power losses. The major benefits of series capacitors is in which the quantum of compensation is highly responsive to load current and series capacitors could be remain in the circuit during the complete load cycle, without causing some adverse effect of over voltages, in during low load conditions.

Posted Date: 2/6/2013 6:01:03 AM | Location : United States







Related Discussions:- Connection of shunt capacitors at 11 kv substation, Assignment Help, Ask Question on Connection of shunt capacitors at 11 kv substation, Get Answer, Expert's Help, Connection of shunt capacitors at 11 kv substation Discussions

Write discussion on Connection of shunt capacitors at 11 kv substation
Your posts are moderated
Related Questions
You are expected to do the experimentation on digital electronics and realize the result...


Question: a). Draw the energy diagram of a pn junction: (i) at thermal equilibrium, (ii) when a forward bias with magnitude half the built in potential (V = φk/2) is applie

1) Assume that we are given the continuous-time signal xa (t) = xa1 (t) + xa2 (t) + xa3 (t), where, xa1 (t) = 2 + cos3 (2pf1 t + p 3 ) + 2 cos(2pf2 t), xa2 (t) = 2 cos(2pf3 t)

For carry flag  CC ( Call on Carry ) and CNC ( Call  on No Carry ) Instructions CC Calls  the subroutine form  the specified memory  location if carry flag  is set (CY=

Q. Write short note on Common vs. associated channel signalling. Associated vs. Common channel signalling: Out band signalling suffers from very limited bandwidth. Both a

Aims Exploring the analog output capabilities of the PIC trainer Write PIC assembly code to implement a simple multi-function signal generator Equipment PIC Trainer

We are given an M=32 pulse sequence of slow time data, collected with PRF = 10 kHz.  We want to use a Cooley-Tukey radix 2 FFT algorithms to compute the Doppler spectrum of the dat

SBI Subtract Immediate  with Borrow  Instruction This  instruction is  used to subtract 8 bit  data and  borrow from the  accumulator. The  result of  the operation is  stored

Loudspeakers using single driver are unable to cover the entire frequency band from low frequency to high frequency. Sometimes multiband frequency is required for the bass enhancem