Compaction to freshly placed concrete piles, Civil Engineering

Compaction to freshly placed concrete piles 

In general practice, reliance is placed on the self-compaction of particularly designed concrete mixes to achieve adequate compaction. The use of vibrating devices such as poker vibrators is rarely adopted for the compaction of concrete piles. As a matter of fact, other than the consideration of the impracticality in using vibrating device in long piles, there is serious concern about possible occurrence of aggregate interlock that poses difficulty at the time of casing extraction. In the worst scenarios, temporary casings together with reinforcement cages are extracted at the time of the lifting up of pile casings. This is another reason that accounts for not using vibrating machines for piles with casing extraction.

Posted Date: 8/7/2013 7:17:05 AM | Location : United States







Related Discussions:- Compaction to freshly placed concrete piles, Assignment Help, Ask Question on Compaction to freshly placed concrete piles, Get Answer, Expert's Help, Compaction to freshly placed concrete piles Discussions

Write discussion on Compaction to freshly placed concrete piles
Your posts are moderated
Related Questions
Question Why are transitional jacks designed in pipe jacking projects? Answer While development of pipe jacking stops, building up of confrontation is extremely

WHY WE ARE USING MAMENT OF INERTIA IN STRAIN ENERGY STRUCTURE

Q. Free- fall concrete placement in bored piles? Based on the research by STS Consultants Ltd it was found that concrete placed by free falling below 120 feet will not suffer f

State the maximum amount of resistance in a pole The maximum amount of resistance in a pole is generally required at the base and, so, the maximum cross sectional area is requi

i have three civil engineering fluid mechanics. 1 manometer problem 2 estimate the discharge for a channel 3 pipe system - direction of flow in line and what the value of flow in l

Softening Point Test: The temperature at which bitumen softens is determined by the "Ring and Ball" test (Figure). (a) Diagram of Apparatus at Beginning of Test  (b


principles of levelling

Define the term - post-tensioned concret In the Prescon and B.B.R.V. systems button heads are created at the ends of tendons. In the case of Prescon system, 2 to 130 tendon wir

criteria for economical span length in bridge