Common defects - bituminous roads, Civil Engineering

Common defects - bituminous roads:

Cracks can be filled with a bitumen emulsion. Wide cracks can be filled with premix sand asphalt.

If an overlay is to be laid on a cracked surface, it is necessary to ensure that the cracks do not travel upwards in the newly laid material. For this purpose, a Stress Absorbing Membrane (SAM) layer or a Stress Absorbing Membrane Interlayer (SAMI) is used. SAM is an application of polymer modified bitumen and covering it with aggregate chips. SAMI is similar to SAM but is followed by an overlay. SAMI can consist of polymer modified bitumen or bitumen impregnated geotextile.

When cracks are extensive, it is preferable to treat the area with a fog seal or slurry seal. The fog seal consists of spraying a bitumen emulsion followed by blinding with graded grit of size 3 mm and lower sizes. A slurry seal is a mixture of fine aggregate, Portland cement filler, bitumen emulsion and additional water, mixed in a mobile mixer and laid to a uniform thickness of 1.5 mm - 5 mm and rolled.

When the surface of the bituminous carpet is loose or has got oxidized, it is necessary to renew the surface by a thin course, consisting of surface dressing, premix carpet, mix- seal surfacing and a semi-dense carpet, depending upon the traffic and importance of the road. The renewal is done once in 3 to 5 years. The renewal helps in restoring the riding quality.

If the surface becomes fatty, a sprinkling of coarse sand or fine chippings and rolling will help.

If the surface becomes very smooth and slippery and has lost its skid-resistance properties, an application of surface dressing can restore its anti-skid properties.

Posted Date: 1/22/2013 5:37:13 AM | Location : United States







Related Discussions:- Common defects - bituminous roads, Assignment Help, Ask Question on Common defects - bituminous roads, Get Answer, Expert's Help, Common defects - bituminous roads Discussions

Write discussion on Common defects - bituminous roads
Your posts are moderated
Related Questions
Question In search reclamation, what are considerations in choosing between trailer suction hopper dredgers and grab dredgers ? Answer Trailer suction hopper dred

Explain briefly physical classifications of stone

A project requires that activities A and B can be started independently and activities C and D are independent but can be started after A and B have been completed. Activity E can



Write definition of the following - (i) Afflux. ( ii ) Free Board. ( iii ) Clearance. ( iv ) Via duct. ( v ) Skew Bridge ( vi ) Cause Way. ( vii ) Clear Span. ( v

Grouted or Penetration Macadam: This is a specification where the binder is sprayed on a compacted layer of stone aggregates and is allowed to penetrate and bind the aggregat

Guidelines for Selection of Site: The following are some of the guidelines for selecting the site of a bridge : (a) A site which is on a straight reach of the river is pref

Determine the uses of Full Prestressing A prestressed concrete structural member is said to be fully prestressed if sufficient prestresses are introduced so that  tensile stres