Cleaning and greasing of steel sliding bearings :
Following equipments are required for greasing of steel sliding bearings:
1. Jacks (50 ton capacity) - 2 nos.
2. Hard wooden packing below and above jack
3. Grease graphite Grade 3 conforming to IS:508
4. Kerosene or released black oil for cleaning
5. 6 mm thick steel scrapers
6. Mortar pan
7. Cotton waste
Greasing of sliding bearings can be undertaken under traffic with issue of caution order and line protection for temporary works as per provision of IRPWM.
Lifting of girder should be restricted to 8 to 10 mm only, ensuring that the bearing strip does not get lifted over locking strip and guide strip to avoid creep of girder in logitudinal and lateral direction. For lifting, it is not necessary to break the track. Only loosening of fish bolts and dog spikes over a small length on both sides of the pier is sufficient. Only one end of the girder should be lifted at a time and steel scraper inserted between bearing strip and base plate to remove old grease dust and dirt. The contact surface is cleaned with oil and grease applied. Girder is then lowered back over the base plate. Time required for all these activities is approximately 15 to 20 minutes.
how are vectors used in civil engineering
Explain the term - strength cement It should be appreciated that the tensioning arrangement shall have to be kept in place until tendons are cut. This shall depend on how quick
Premix Carpet: An open graded premix carpet, commonly called premix carpet (PC), is an open graded premixed material laid to a thickness of 20 mm and rolled, followed by a se
What are the uses of alloys in daily life and how are alloys made? Ans) Alloying is not always done to make a 'superior' material, but to produce materials having a desired requ
rectangular grid method for representing contours
What is the purpose of the gap in the road on this bridge? Ans) Purpose of the gap in the road is to permit the road to expand and contract with temperature alters without causi
What is the rate of application of Prime coat over WBM
Are diaphragms necessary in designing of concrete box girder bridges ?
Define Storms - underwater inspection of bridge? Storms can have a detrimental effect on bridge substructure. The velocity and depth of water and debris carried increase in rel
find the equation of the line with slope 4 and passing through the point of intersection of the line x+6y-4=0 ad 3x-4y+2=10
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd