Chain Surveying:

In the chain surveying, you have studied the basics of chain surveying. In chain surveying, various equipment and instruments are used for measuring distances along survey lines and thereform important ground features through setting out offsets. The offsets can be set at desired points on survey lines or from ground features on survey line. Several technical terms generally used in chain surveying are also defined and explained.

Procedures of chain surveying including fixing of survey stations, ranging of survey lines and setting the offsets have been discussed in detail. Generally experienced difficulties and obstructions in surveying exercise are explained along with probable errors in measurements of distances and their adjustments.

The procedure for recording measurements in field books has been elaborates so that the records could be simply understood, retrieved and referred to at any future date.

Posted Date: 1/24/2013 12:10:04 AM | Location : United States







Related Discussions:- Chain surveying, Assignment Help, Ask Question on Chain surveying, Get Answer, Expert's Help, Chain surveying Discussions

Write discussion on Chain surveying
Your posts are moderated
Related Questions
Compaction to freshly placed concrete piles  In general practice, reliance is placed on the self-compaction of particularly designed concrete mixes to achieve adequate compact

According to National Building Code (Sp:7 1970), the differential settlement shall be kept within the limits to which the superstructure can accommodate itself without harmful dist

limitation in using with bitumen as watertight material

Concrete surround is generally adopted for rigid drainage pipes to resist high traffic loads (for instance under shallow covers) and to allow for using pipes with lower strength. F


A heavy equipment rental company uses a high interest rate of 30% for the rental of a specialty heavy haul dump truck.  The net annual profit for this investment is most nearly:

If i want to find D, and D=2a, then a=1-5 how can i show the ans is:2&4&6&8&10

On a 5-acre level terrain building site, an earthwork contractor has instructed her crew to strip and grub the topsoil of a 60,000-ft 2 proposed building pad to a minus 2-ft sub-g


WHAT LUG ANGLE