chain surveying, Civil Engineering

describe setting out right angle at given point on a chain line and when the point lies outside the chain line
Posted Date: 9/27/2013 1:29:57 PM | Location : USA







Related Discussions:- chain surveying, Assignment Help, Ask Question on chain surveying, Get Answer, Expert's Help, chain surveying Discussions

Write discussion on chain surveying
Your posts are moderated
Related Questions


What is reciprocal ranging

What is highway economics and what are its main contents to study ?

As per Australian Standard AS 1170, what are the different types of loads that can be encountered by structures which need to be taken into account for their design?

Define Storms - underwater inspection of bridge? Storms can have a detrimental effect on bridge substructure. The velocity and depth of water and debris carried increase in rel

State about the Prestressing Steel For prestressed concrete members, the high-tensile steel, used generally, consists of wires, bars or strands. The high tensile strength of s

use of centroid in civil engineering

determine the cross section of a rectangular beam of uniformly strength for a simply supported beam of 6m span subjected to central concentrated load of 20kN a)by keeping depth of

Immersed tube method for underwater crossing includes the following basic construction steps: (i)  Prefabricating long tunnel units (concrete orsteel shell) in a dry-dock or shi