Calculate the flood discharg, Civil Engineering

Q. A bridge is to be constructed over a stream having a catchment area = 20 miles2 partly in plains and partly in hills. Portion in hills has a length of 1.7 miles and fall of 880 ft. and that in plains has a length of 5.7 miles and a fall of 244 ft. Calculate the flood discharge if co elf of discharge is 80 % and area factor 95 5 and value of constant for calculating time of concentration = 14 for hills and 6 for plains. One hr rain fall intensity may be assumed as 2.5''.

Posted Date: 6/25/2013 7:51:04 AM | Location : United States







Related Discussions:- Calculate the flood discharg, Assignment Help, Ask Question on Calculate the flood discharg, Get Answer, Expert's Help, Calculate the flood discharg Discussions

Write discussion on Calculate the flood discharg
Your posts are moderated
Related Questions
The free float is equal to: a. Latest allowable event occurrence time + Early finish time b. Earliest event occurrence time + early finish time c. Latest allowable event o

Enumerate about the Bonded Member It is a concrete member in which tendons are bonded to the concrete. They may be directly bonded to the concrete as in the case of pre-tension

NEED TO DESIGN A CANTILEVER RETAINING WALL 8M HIGH, SATURATED UNIT WEIGHT IS 16KN/M3, SURCHARGE IS 7KN/M2, LOAD ABOVE WALL SUPPORTED ON WALL STEM IS 10KN/M RUN, ANGLE IN INTERNAL F

designing of guide bunds

closed traverse ABCDE form a regular polygon with fore bearing of line is 35 find the bearing of other lines

Define the Hazard Ranking system (HRS) - A procedure for ranking uncontrolled hazardous waste sites in terms of the potential threat based upon the containment of the route of

Q. Application of embankment condition for drainage design? In considering loads on buried pipeline, there are generally two scenarios: narrow trench condition and embankment (

Using Matlab/ Simulink software to model the overall building fabric heat transmit characteristics, in order to estimate the maximum rate of heat loss (kW) from the building under


Explain the term - Moderate Prestressing In this form of prestressing, no limit is imposed onĀ  the magnitude of tensile stresses which may be produced in a concrete member unde