Calculate the diameter of the stockpile, Civil Engineering

Assignment Help:

1. On a 5-acre level terrain building site, an earthwork contractor has instructed her crew to strip and grub the topsoil of a 60,000-ft2 proposed building pad to a minus 2-ft sub-grade. The soil has a swell of 40% and an angle of repose at 30°. The diameter of the stockpile.

2. An earthwork contract was awarded to excavate and backfill the foundation of a proposed 75-ft by 75-ft office building.  The existing grade elevation is 37.00-ft while the sub-base for the below grade basement is 31.50-ft. The concrete contractor requires a 3-ft perimeter walkway in order to place the concrete formwork. Soil conditions are classified as OSHA Type B soils which require 1H:1V side slopes.The total volume (yd3) excavated.

 


Related Discussions:- Calculate the diameter of the stockpile

What is stress corrosion, What is Stress Corrosion Stress corrosion ta...

What is Stress Corrosion Stress corrosion takes place in prestressed concrete tendons due to the combined actions of corrosion and static tensile stresses. This type of attack

Water bound macadam road, What is the binding material of the water bound m...

What is the binding material of the water bound macadam road

Project data , finding the mean ,mode and mediam

finding the mean ,mode and mediam

Intercepting drains, Intercepting Drains: Intercepting drains, also k...

Intercepting Drains: Intercepting drains, also known as catch-water drains, are provided in the uphill slope of hill roads to intercept the water and lead it to a natural wat

Surveying, what is meant by geodetic survey

what is meant by geodetic survey

#manholes, #how are manholes mantained

#how are manholes mantained

Atomic polarisability, what is the atomic polarisibility of argon its susce...

what is the atomic polarisibility of argon its susceptibility is 273k and 1 atm is 4.35*10^-4 and n is 2.7*10^25atoms/m^3

Write definition of afflux and skew bridge, Write definition of the followi...

Write definition of the following - (i) Afflux. ( ii ) Free Board. ( iii ) Clearance. ( iv ) Via duct. ( v ) Skew Bridge ( vi ) Cause Way. ( vii ) Clear Span. ( v

Write Your Message!

Captcha
Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd