Calculate the cycle and production rate , Mechanical Engineering

Calculate the Cycle and Production Rate for Single-Machine Robotic Cell

Determine the cycle and production rate for a single-machine robotic cell for an 8-hr shift if the system availability is 85%. Also find out the percent utilization of machine and robot. On average, the machine takes 35 sec. to process a part. The other robot operation times are as follows:

Robot moves the shaft to the lathe                                            1.5 sec

Robot unloads the shaft from the lathe                                       0.5 sec

Robot picks a shaft from the conveyor                                        4.0 sec

Robot loads the shaft onto the lathe                                          1.0 sec

Robot moves the conveyor                                                        1.5 sec

Robot puts the shaft on the outgoing conveyor                            0.5 sec

Robot moves from the output conveyor to the input conveyor        5.0 sec

Description of Solution Approach

The total cycle time of 49 seconds is achieved by adding all of the activities of the robot by including the machining time and other related activities. The production rate is the reciprocal of cycle time. The production rate considering system availability is therefore

Production rate = 1 unit /49 sec. (60 s / min) (60 min / h) (  8 h/ shift) (0.85% uptime)

                       = 500 units per shift

Machine Utilization = Machine cycle time /Total cycle time

                           = 35/49 = 0.7142 or 71.42%

Robot utilization = Robot cycle time /Total cycle time

                        = 14/49 = 0.2857 or 28.57

Posted Date: 12/27/2012 3:14:15 AM | Location : United States







Related Discussions:- Calculate the cycle and production rate , Assignment Help, Ask Question on Calculate the cycle and production rate , Get Answer, Expert's Help, Calculate the cycle and production rate Discussions

Write discussion on Calculate the cycle and production rate
Your posts are moderated
Related Questions
Explain Gear Milling Milling is a form-cutting process limited to making single gears for prototype or very small batches of gears as it is a very slow and uneconomical method

i would like to know how much it would cost to for my assignment without the actual graphs but the dimentions and without the assignment being converted into a word document as lon

5. Calculate and draw the Shear force and Bending moment diagrams for the loaded beam and determine the maximum moment M and its location x from left end

(a) Describe clearly the constructional details and operation of various rear axle drives with the engine placed at the front. Illustrate your answer with simple and neat sketch.

Thermodynamics. Justify that it is the science to calculate energy, energy and entropy. Sol : Thermodynamics is science which deals with conversion of heat into mechanical e

A simply supported beam ABC with supports at A and B , 6m apart and with an overhang BC 2 metres long takes uniformly distributed load of 1.5 KN/metre length over the entair length

A radically inward flow turbine working under a head of 10 m and running at 250 rpm develops 185 KW at the turbine shaft. At inlet tip of the runner vane, the peripheral velocity o

Question 1 What is the eutectoid composition in the phase diagram? Question 2 For an alloy of 40%C/60%D at 400°C, indicate the phase/s that are present. It is not neces

Armature core and armature winding  Armature is the rotating part of the machine. It is cylindrical in shape with slots on its outer periphery. It houses the armature conducto