Already have an account? Get multiple benefits of using own account!
Login in your account..!
Remember me
Don't have an account? Create your account in less than a minutes,
Forgot password? how can I recover my password now!
Enter right registered email to receive password!
A helical compression spring prepared of oil tempered carbon steel is subjected to a load which lies between 400N to 1000N. The spring index is 6 and the design factor of safety is 1.25. If the yield stress in shear is 350 MPa Calculate:
(i) Size of the spring wire
(ii) Diameter of the spring
(iii) Number of turns of the spring and
(iv) Free length of the spring.
The compression of the spring at the maximum load is 30 mm. The modulus of rigidity for the spring material may be taken as 80kN/mm2.
BOILERS: BOILERS : Boilers can be defined as closed pressure vessels that are used to generate steam at pressure much higher than atmospheric pressure by the transfer of he
Determine forces in members of cantilever truss: Determine forces in members B C and BD of cantilever truss shown in the figure in the figure given below.
Stitch Welding This is a variation of spot welding, in which a series of overlapping spot welds are made in the same manner as stitching cloth. Stitch welding may be performed
Applications. The welding process finds widespread applications in almost all branches of industry and construction. fabrication and creation of steel structures
(a) Mention the needs to be satisfied by power transmission system of vehicles. (b) What is an overdrive? Explain its principle of operation and advantages.
Pyrolysis Pyrolysis is the procedure of depositing a ceramic on a heated substrate. The process is used to deposit coating or generate thin walled components of graphite or si
What do you mean by thermodynamic equilibrium? Compare irreversible process with reversible process. Give some examples of irreversible process.
explain with suitable eg. static and dynamic force analysis
explain
Materials requirements planning: Materials requirements planning (MRP) is a set of process for converting forecasted demand for a manufactured product into a requirement sched
Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!
whatsapp: +1-415-670-9521
Phone: +1-415-670-9521
Email: [email protected]
All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd