bridge engineering, Civil Engineering

long span bridge or continuous bridge which is more preferable and why ???
what is the major problem in continuous bridge and what would be its effect if there is any differential settlement?????
Posted Date: 1/12/2015 11:52:18 PM | Location : USA







Related Discussions:- bridge engineering, Assignment Help, Ask Question on bridge engineering, Get Answer, Expert's Help, bridge engineering Discussions

Write discussion on bridge engineering
Your posts are moderated
Related Questions

Dock Wall and Dry Dock: Dock Wall Figure gives the diagram of a dock wall. Figure: Mass Concrete Dock Wall Dry Dock Figure 9 gives the details


Ceramics is what type of materials ? Answer: It is  an insulators.

how to account for density?

Q. Explain Gap Survey and adjustment of Gap? Gap survey and rectification of gaps is to be carried out, in stretches where track develops excessive creep jammed joints, sun kin

I need to find support reactions at O for the beam with a distributed load, a 6 kN moment couple at A and a 3 kN axial load as shown in picture.

Calculate the change in volume: If the bar is 1 m long with rectangular cross section of 300 mm deep and 400 mm wide, compute the change in volume of the solid because of a lo

Question While precast concrete jacking pipes , from time to time grout holes are calculated inside these precast pipes. Give specific and key reasons? Answer Grout h

Q  A transition curve is required for a circular curve of 200-meter Φ radius, the gauge being 1.5 m. and max super elevation restricted to 15 cm. The transition restricted to 15 cm