assignment 2012, Operation Research

Problem 1 (Problem 23, page 507) At a machine tool plant, five jobs must be completed
each day. The time it takes to do each job depends on the machine used to do the job. If a
machine is used at all, there is a setup time required. The relevant times are given in Table
20. The companys goal is to minimize the sum of the setup and machine operation times
needed to complete all jobs. Formulate and solve (with LINGO) an integer programming
problem whose solution will do this.
i''m not sure how to start the variables and constraints or how to write it into a lingo program
Posted Date: 10/15/2012 8:12:49 PM | Location : United States







Related Discussions:- assignment 2012, Assignment Help, Ask Question on assignment 2012, Get Answer, Expert's Help, assignment 2012 Discussions

Write discussion on assignment 2012
Your posts are moderated
Related Questions

how i make project report on "application of or".i want help from you.can you give me idea to complete this report..

Model building is the essence of the operations research approach? Discuss.


- A paper mill produces two grades of paper viz., X and Y. Because of raw material restrictions, it cannot produce more than 400 tons of grade X paper and 300 tons of grade Y pape

Solve the following Linear Programming Problem using Simple method. Maximize Z= 3x1 + 2X2 Subject to the constraints: X1+ X2 = 4 X1 - X2 = 2 X1, X2 = 0

source code in c available?

how to solve it

a manufacture wants to ship 8 loads of his product as shown below. The matrix gives the mileage from origin to the destination D.