Problem 1 (Problem 23, page 507) At a machine tool plant, five jobs must be completed
each day. The time it takes to do each job depends on the machine used to do the job. If a
machine is used at all, there is a setup time required. The relevant times are given in Table
20. The companys goal is to minimize the sum of the setup and machine operation times
needed to complete all jobs. Formulate and solve (with LINGO) an integer programming
problem whose solution will do this.
i''m not sure how to start the variables and constraints or how to write it into a lingo program
Posted Date: 10/15/2012 8:12:49 PM | Location : United States







Related Discussions:- assignment 2012, Assignment Help, Ask Question on assignment 2012, Get Answer, Expert's Help, assignment 2012 Discussions

Write discussion on assignment 2012
Your posts are moderated
Related Questions
Simple Graph The values of the two variables are plotted on a graph paper. We get two curves one for x variables and another for y  variables. These  two curves reveal the dir

Question 1 Discuss the impact of Henry Fayol's principles of management on the modern techniques of management with the help of suitable examples Question 2 Explain the Gary

Case  Study - Data Analysis Sandarsen  inc was testing new  packaging  and a few  recipe  for a family  desert cookie  that had  been  on the  market for several years. It wa

1 strategic implication of product and process decisions 2 process planning and design 3 work measurement

Solve the following Linear Programming Problem using Simple method. Maximize Z= 3x1 + 2X2, Subject to the constraints: X1+ X2 = 4 X1+ X2 = 2 X1, X2 = 0

Describe Operation Research and discuss its applications in various organizations. A company assembles heavy duty refrigerators and uses two types of compressors A & B. Two comp

An operation is a combination of different actions dealing with raw materials( e, g, men and machines) which form a structure from which an action with regard to broader ob

Form of t- Distribution 1. The students  t - distribution  like the  normal  distribution has bell shaped frequency  curve which is symmetrical. The only  parameter which  det

Six Operators are to be assigned to five jobs with the cost of assignment in Rs. given in the matrix below. Determine the optimal assignment. Which operator will have no assignment

Discuss the methodology of operation research