Analysis the production in manufacturing company, Project Management

Analysis

The factory has the process for the following:  QC of sampling,  receiving orders,  receiving fabrics and accessories,  checking of fabrics,  drawing,  cutting,  sorting,  sewing, pressing,  quality Control,  packing and delivery.  

414_Analysis.png

As the factory was originally designed for in-house production, it has some problems in adjusting the processes according to the new and demanding requirements.  Further it was also noted that the factory is completely lacking proper planning and scheduling of all the activities.  There are bottlenecks in resource allocation for various process units.  For example, the unit need to go to the regular production unit for fixing accessories and for pressing for sampling processes. This, not only delays the sampling unit, but also interrupts the regular production processes.  Sewing accessories has to be interrupted and machines have to be re-adjusted for sampling to meet the current regular production processes.

357_Analysis1.png

Comparing the problems with theory and practical processes.

Need to discuss on standard production planning and the difficulties in adopting the standard practices.  The factory needs to verify the standard garments production time using standard process time.  It requires reviewing the resources allocated at various processes and readjusting the resource requirements.  For example, it is possible to reduce the ideal time in adjusting the machines that are doing regular production by increasing one more worker and introducing one more sewing machine for the sampling unit.

Posted Date: 2/25/2013 2:48:46 AM | Location : United States







Related Discussions:- Analysis the production in manufacturing company, Assignment Help, Ask Question on Analysis the production in manufacturing company, Get Answer, Expert's Help, Analysis the production in manufacturing company Discussions

Write discussion on Analysis the production in manufacturing company
Your posts are moderated
Related Questions
Question: (a) Risk has always been an intrinsic part of project management. With increasing market competition, technology, and globalization, risk management is continuously

From what product must the acceptance criteria for a project is derived and why? The acceptance criteria must be derived by the Requirements Specification that is where the use

Assume that you have been asked to procure a new integrated software application for patient records management for your local hospital. Describe the process you would follow to sh

Problem 1: Is closing of a clinical trial as important as initiation? Justify your answer with suitable examples. Difference between closing of a clinical trial and initi


Question: a) What are the skills required by a project manager? b) What are the basic principle stages in a project life cycle? c) Suppose you are involved in the pl

MBO process MBO is the process of collaborative goal setting between the manager and his or her subordinates. It assumes that goals are consistent or compatible from the highes

For this unit (Computer Project), you are required to plan, analyse, design, implement, test, document and demonstrate a prototype of your choice.  Once you have identified a fo

Uses and Benefits of RBS  The main uses and benefits of the RBS are outlined in this section.  Risk identification aid  Risk Breakdown Structure is used as a list that

Define the Resource Histograms in short. Resource histograms A resource histogram is a column (or bar) chart which demonstrates the number of resources allocated to a pro