Analysis the production in manufacturing company, Project Management

Analysis

The factory has the process for the following:  QC of sampling,  receiving orders,  receiving fabrics and accessories,  checking of fabrics,  drawing,  cutting,  sorting,  sewing, pressing,  quality Control,  packing and delivery.  

414_Analysis.png

As the factory was originally designed for in-house production, it has some problems in adjusting the processes according to the new and demanding requirements.  Further it was also noted that the factory is completely lacking proper planning and scheduling of all the activities.  There are bottlenecks in resource allocation for various process units.  For example, the unit need to go to the regular production unit for fixing accessories and for pressing for sampling processes. This, not only delays the sampling unit, but also interrupts the regular production processes.  Sewing accessories has to be interrupted and machines have to be re-adjusted for sampling to meet the current regular production processes.

357_Analysis1.png

Comparing the problems with theory and practical processes.

Need to discuss on standard production planning and the difficulties in adopting the standard practices.  The factory needs to verify the standard garments production time using standard process time.  It requires reviewing the resources allocated at various processes and readjusting the resource requirements.  For example, it is possible to reduce the ideal time in adjusting the machines that are doing regular production by increasing one more worker and introducing one more sewing machine for the sampling unit.

Posted Date: 2/25/2013 2:48:46 AM | Location : United States







Related Discussions:- Analysis the production in manufacturing company, Assignment Help, Ask Question on Analysis the production in manufacturing company, Get Answer, Expert's Help, Analysis the production in manufacturing company Discussions

Write discussion on Analysis the production in manufacturing company
Your posts are moderated
Related Questions
A project manager desires a work breakdown structure that goes through 6 levels of detail. Level 3 through level 6 would most likely be prepared by


Q. What level of project management do I need? A. This is a complicated question to answer for the reason that it very much depends on the size duration and technical complex


X Company, a private security firm, has signed a contract to fund the design, construction and running of a local police station. This arrangement is a public private partnership a

What are the benefits of project management software? Project management (PM) software benefits are as follows: a. Project scheduling b. Budgeting and controlling cost

At what point into the project lifecycle must the business case be prepared? The short respond to this is ‘before any exact work has been completed and before main resources ar

What are the contents of project planning document? Contents of a PPD (project planning document): a. Project resource plans b. Quality control and quality policies proce

Flow Charts Flow chart is the most familiar tool to understand processes. It is used to identify a sequence of events in a process. Using flow charts require six deliberate act

The primary benefit of implementing quality design techniques is a significant decrease in time to market. Other benefits of quality by design techniques are: 1. Faster