Airport drainage, Mechanical Engineering

Airport Drainage:

Rainwater should be quickly taken away from the runway, taxiway and apron areas. For drainage of runway and taxiway, a cross-slope of 1.5 per cent on either side of the centre line is provided in the paved portion and shoulders. The water is then led to side ditches and then led to natural drainage channels (Figure).

1260_Airport Drainage.png

Figure: Runway Cross-section

Posted Date: 1/23/2013 1:37:01 AM | Location : United States







Related Discussions:- Airport drainage, Assignment Help, Ask Question on Airport drainage, Get Answer, Expert's Help, Airport drainage Discussions

Write discussion on Airport drainage
Your posts are moderated
Related Questions
Heat Treating Equipment: The major equipment for heat treatment is furnace. There are two main categories of furnaces - batch and continuous. The furnace selection needs cons

Determine the centroid of the truss Gusset Plate shown in figure below.

What are the condition that could allow a continuous chip to be formed in a metal cutting ? How is metal removed in metal cutting? Illustrate the Process with neat sketch. What

Q. What do you mean by Weld and hold time? Weld time During this period the welding current flows through the circuit, i.e., it enters from one electrode, passes through t

1. I have a data for displacement versus time ( graph) then I want to get the velocity and acceleration graphs from the displacement.How can I get it?

General Phase of Radial Drilling Machine Steps- 1. Prepare a strong foundation for the value study. In radial drilling machine hole can not be produce in any angle.

Objectives After studying basics troubleshoot of motorcycle, you should be able to check, perform inspection and identify the reason(s) of various problems reported by

ladder slip: A uniform ladder having length of 7m rests against vertical wall with which it makes an angle of 45ยบ, coefficient of friction between ladder and wall is 0.4 and

how did the formula derived smax = Ed1 a ?T/d 2