power sector economics & planning, Electrical Engineering

1.  The rejection criteria of an investment project, as evaluated from the NPV method is that NPV should be equal to zero.

2.  Technical feasibility is the only criteria to determine the feasibility of business/projects.

3.  Equity financing does not require the business to directly repay the money lent or invested by the financier.

4.  The impact of power sector subsidies is same on different categories of consumers.   

5. Does tax concessions can be considered as Subsidies in the case of Power sector?

Posted Date: 2/23/2013 6:29:13 AM | Location : United States







Related Discussions:- power sector economics & planning, Assignment Help, Ask Question on power sector economics & planning, Get Answer, Expert's Help, power sector economics & planning Discussions

Write discussion on power sector economics & planning
Your posts are moderated
Related Questions
Calibration and Testing of Energy Meters and Meter Laboratory Energy meters form a vital instrument of revenue realization for the distribution utilities. Based on the meter r

Q. What do you mean by Load factor? The two components of electric service are demand and energy. Demand is the maximum level of real power which the electric utility must supp

Q. What do you mean by Source Encoding? After the quantization of message samples, the digital system will then code each quantized sample into a sequence of binary digits (bit

Revision  of Basics Although  it is  assumed in this book  that the  reader has  enough  knowledge of  various number systems ( binary, octal and hexadecimal and their relation

The reversibility principle of electrical machines states that an electrical machine can be used to operate either as a motor, converting electrical to mechanical energy, or as a g

what is event triggering related to digital storage oscilloscope?

Compute the ampacity of a 250 AWG copper conductor with type UF insulation that will be used in an area with an ambient temperature of 79°F (26°C). State the ampacity and explain h

Consider an S band (3 GHz) radar with a rotating aperture antenna with a width of 3 m.  Suppose the antenna rotates at a rate of one rotation every 10 seconds.  Assume the 3 dB bea

Q. Some element voltages and currents are given in the network con?guration of Figure. Determine the remaining voltages and currents. Also calculate the power delivered to each ele

Q. A dc series motor, with a design constant K a = 40 and flux per pole of 46.15 mWb, operates at 200 V while taking a current of 325 A. The total series-field and armature-circui