Project 1 - Work readiness and structural planning

Part A: Getting work ready

Note: This is a compulsory pre-assessment task that you must complete to enable you to carry out practical assessments later in this course. However, this task will not contribute to the results recorded for your assessment in this unit. Do not bother with this Part

Part B: Planning for structural integrity - Class 1 and Class 10 building
Plan for the erection of the structure of the Casey house (Class 1) and fencing (Class 10) including:

- applying structural principles when planning the erection of the structure of the house and fencing including footings, floor system, structural and non-structural walls, roofing and external wall cladding. Refer to AS 1684 - Non-cyclonic.
- Explore forces and loads, and mechanical properties of materials.
- analysing plans and building materials for structural integrity to withstand bushfire, high winds, earthquake, etc.
- seeking professional advice/input from architects, engineers, etc.
- outlining how you would coordinate the demolition of any existing structures (e.g. a garage) in accordance with legislative and planning requirements, environmental standards, and safe work practices.
- describing what is involved in conducting a pre-commencement site inspection.

a) Read the scenario below that relates to the building of the Casey house and respond to the questions that follow.

Scenario
Consider the plans for the Casey house and imagine that you are responsible for planning the building of this house in a bushfire-prone alpine area: Casey plans - Sections, Elevations, Floor Plan, Site Plan.
As part of the planning process you need to ensure the structures and materials you use will togetherwithstand the loads and forces that will act upon them, and ensure the stability of the building.

Outline the main structural principles that might apply to the construction of the Casey house includingforces, loads and mechanical properties of materials. Include two examples of each principle that would apply to the Casey house. (400 words max)

- Loads (include two examples):
- Forces (include two examples):
- Mechanical properties of materials (include two examples):

b) Review the four Casey plans and consider the structural systems that will be used in the construction including the footings, floor system, structural and non-structural walls, roofing and external wall cladding: Casey plans - Sections, Elevations, Floor Plan, Site Plan.Remember that you are planning to build the Casey house in a bushfire-prone alpine area.
Complete the table below outlining the materials and performance characteristics for each structural system, and where you would seek expert advice.

c) In the box below, complete a 2-D, freehand, cross-section drawing showing a gable roofing structure at 22.5 degree. Drawing is not to scale and is primarily assessing your knowledge of materials and structural performance characteristics, not your drawing skills.
You must show the following items in your drawing:
- A gable-end roof structure
- The materials that will be used in the structure
- Structural performance characteristics of the materials and the structure

d) Before the construction of the Casey house, consider how you might go about demolishing any small existing structures such as a garage and brick fencing. Briefly outline the steps you would take for the demolition processincluding the planning, and the environmental and safety requirements you would need to comply with. (200 words max)Please complete

Hint: To assist with the work safety requirements, look at the ‘Notification of demolition work' form on the Sullivon Constructions website. This form is used to notify WorkCover of demolition work under the Work Health and Safety Regulation 2011.

e) Once the construction planning and demolition processes are complete for the Casey house, a pre-commencement site inspection will need to be conducted. Briefly list the factors that would need to be checked for this inspection. (200 words max)

In completing your final assessments, you will show evidence of your ability to:
- Plan, coordinate and manage the laying of floor system.
- Plan, coordinate and manage the building of structural and non-structural wall systems.
- Plan, coordinate and manage the building of roof system.
- Plan, coordinate and manage the external wall cladding of structure.

Project 2 - Coordinating the construction for structural integrity

a) Revisit the Casey plans you reviewed in Project 1 for this module. Casey plans - Sections, Elevations, Floor Plan, Site Plan.
Create your own checklist using the table below to assist the construction manager/foreman to coordinate and check the building.
Your checklist will include the following structural systems, and list what needs to checked for quality and compliance with the NCC and Australian Standards:
- footings
- floor system
- structural and non-structural wall systems
- roof system
- external wall cladding of structure
- fencing


b) In the box that follows, complete 2-D, freehand, cross-section drawings showing x2 structural wall types of your choosing for a low rise building. This task is primarily assessing your knowledge of the NCC, Australian Standards, structural components and quality checks.

You must show the following items in your drawing:
- Structural walls
- Relevant NCC and Australian Standards
- Structural components e.g. bracing components
- Quality checks needed for compliance

https://www.dropbox.com/s/dnhiu8540te3ski/retv95.zip?dl=0

Attachment:- Apply structural principles to residential low rise constructions.rar

Reference no: EM131433616

Questions Cloud

Explain why your top two theories are important : ECE101- Explain why your top two theories and your top two approaches are important to understand and how each will benefit your work with children.
In what ways does the wsq framework address challengers : In what ways does the WSQ Framework address challengers brought about by the VUCA environment?
Leading cross-functional teams : One of the biggest challenges project managers need to overcome is being able to influence their teams without having direct authority over each individual within their project. Frequently, project managers are tasked with overseeing cross-functio..
Missions statements crafted for the organization : Are missions statements crafted for the organization the same as one crafted for a project?
Work readiness and structural planning : Review the four Casey plans and consider the structural systems that will be used in the construction including the footings, floor system, structural and non-structural walls, roofing and external wall cladding.
Prove that for all positive real numbers a and b : CSC165H1 Problem Set. Prove the following statements about little-oh, using only the definitions of little-oh and Big-Oh. You may not use any external properties of Big-Oh in this question. Prove that for all positive real numbers a and b, if a
Identify three job requirements that could apply : Identify three (3) job requirements (e.g., needed certifications, previous work experience, external influences, etc.) that could apply to your chosen scenario. Determine two (2) ways these requirements could impact staffing at your organization. ..
Department for visual arts in metro government of nashville : Imagine you are an an administrator in the Department for the Visual Arts in the Metro Government of Nashville. Your supervisor, Doris Holmes (the administrator of the department) would like for the Metro Government to build a place on a small pie..
Analyze and describe the sources in annotated bibliography : Thereafter, you are required to analyze and describe the sources in the Annotated Bibliography, in the format proposed in the document labelled, "thesis_and_ebook_bibliography".

Reviews

Write a Review

Civil Engineering Questions & Answers

  Show how these two chainages were determined

Figure 13.17 shows proposed curb locations, together with grade stakes offset from the north-side curb. The straight section of curb begins at 0 + 52 and ends at 8 + 38 (centerline stations). With the aid of a sketch, show how these two chainages ..

  What size of orifice is needed to produce a change in head

What size of orifice is needed to produce a change in head of 9m for a discharge of 2 m^3/s of water in a 1-m diameter pipe.

  Calculate the shear strain for the operation

In an orthogonal cutting operation, the tool has a rake angle = 15°.

  What twisting moment would just produce

If the material yields plastically at a yield strength of 80 MPa, what twisting moment would just produce yielding while the compressive force acted?

  Determine the largest loadwhich can be applied

A block of 250mm length and 50x40mm cross section is tosupport a centric compressive load P. The material to be usedis a bronze for which E = 95GPa. knowing that the normal stress must notexceed 80 MPa and that the decrease in length of the block sho..

  Estimate the ground level so2 at a point of the power plant

A power plant emits 95 g/s of SO2 from an effective stack height of 60 m. The wind speed is 3 m/s and the solar insolation is slight. A) Estimate the ground level SO2 (ug/m^3) at a point 4 km directly downwind of the power plant

  What percent of the produced water do they waste

A municipal water plant has four filters that are each 20 ft long by 15 ft wide by 5 ft deep. The demand for water requires that they only operate, on average, three filters per day at a loading of 3 gallons per min / ft^2.

  What can you do to increase the value of your position

Express the position of the debt holders in terms of options on the value of the company.

  Derive a formula for resistance of the spool as a function

You find a spool of pure copper wire while snooping through your brother's purse. The wire has a diameter of 0.3 millimeter and a length of 200 meters. A) Derive a formula for the resistance of the spool as a function of temperature.

  Design the pins so that ledge can support doug and jeremy

Assume the ledge has the dimensions shown and is attached to the building with a series of equally spaved pins around the circumference of the building.

  Why is too much fluoride in drinking water a problem

A chemical mixing basin is to be designed to blend chlorine and treated wastewater. The basin flow is 700 gallons per minute and the basin dimensions are 5 feet by 5 feet by 5 feet water depth.

  Determine is there a chance that cavitation will occur

Temperature is 20°C. A constriction in the pipeline causes velocity to increase to 13 m/s within the constriction. Assuming that Bernoulli's equation applies (i.e. p + ½ ? v2 = constant), is there a chance that cavitation will occur

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd