Why is there no original and current plan

Assignment Help Other Engineering
Reference no: EM131258385

Assignment - TPM

As the lead systems engineer on the Adaptive Cruise Control system, you are required to put together TPM charts for an upcoming Program Management Review. Given the following data sets in the excel file provided, please generate time history charts for the two critical TPMs below.Requirement # 1: The ACC shall meet a Mean Time Between Failure (MTBF) of 1,970 hours.

Requirement # 2: The ACC sensor shall report the range of the forward vehicle to an accuracy of 20 feet as compared to the true range.

In addition to the two charts, please answer the following questions:

1. Why is there no original and current plan shown for the MTBF TPM?

2. What went wrong with the range performance? As the lead systems engineer, what should you have done to recognize and avert the problem shown by the data in this TPM? And when should you have done this?

You can use Excel to generate the charts. See Hints below.

- Hint's for HW#
ATD = Achieved to date

The percentages are how close the estimate/calculations/measurements get to the goal/objective desired
- 'estimated' is based on pre design assumptions from like/similar components/systems
- 'calculated' is based on models/sims of planned design
- 'measured' is actually achieved from testing designed component/system
- essentially determining performance as you progress through life cycle. In order to plot the TPM Charts you may want to make new columns where you calculate the ATD Estimated; ATD Calculated; and ATD Measured and use these new columns for plotting.

In the past students had problems with the TPM charts because they:
- failed to indicate the units and term (MTBF in hours and Range" Accuracy' in feet) on the y-axis,
- leaving out one of the key factors to plot: Threshold, Objective, ATD, and/or Planned.
- not including the "Current Plan" on the accuracy chart
- failing to put the proper name of the TPM on or near the chart.

Attachment:- TPM data.rar

Reference no: EM131258385

Questions Cloud

Large increase in the demand for export : Assume that there is a large increase in the demand for export. Show the resulting short-run equilibrium on your graph. In this short-runequilibrium, is the unemployment rate likely to be higher or lower than t was before the increase in exports? ..
Availability of a new type of capital : 1) Technological change that results in a reduction in the price of capital (or equivalently, the availability of a new type of capital) is more likely to stimulate demand for a particular type or labour if
Does the network contain a zero-length cycle : Always examine a node with the minimum number in LIST. Specify the predecessor graph after examining each node and count the number of distance updates.
Patton-fuller community hospital virtual organization : Imagine your learning team is the human resources management team at the Patton-Fuller Community Hospital virtual organization. The new chief executive officer of your hospital has asked your team to prepare a presentation about human resources at..
Why is there no original and current plan : Why is there no original and current plan shown for the MTBF TPM - what went wrong with the range performance? As the lead systems engineer, what should you have done to recognize and avert the problem shown by the data in this TPM? And when should..
Discussion of the dependence aspects of the drugs : Select one drug from each classification for an in-depth analysis, which should include at least: the effects of those drugs on the human body, a discussion of the dependence aspects of the drugs, and their interactions with other drugs.
Create the heading and leave a blank section : Give a brief description of your independent variable and dependent variable. Provide the specific hypothesis statement which includes the independent and dependent variable.
Analysis of firm resources, capabilities, and value chain : Need an analysis of Celanese Corporations Resources, Capabilities, and Value Chain. Section 4.2 in this format - Analysis of Firm Resources, Capabilities, and Value Chain
Create a postfix notation calculator that performs : Using a loop, branches, and the stack, create a postfix notation calculator that performs the +, -, x, and / operations, as shown in the example in CALC_IN.

Reviews

Write a Review

Other Engineering Questions & Answers

  How much money would be in a savings count

Calculate the present worth in year 0 of the series of disbursements and determine the value in year 8 that is equivalent to the cash flow stated.

  How use of array processing is enabled by use of for loops

Discuss how the use of array processing is enabled by use of For Loops. Explain the process you used in this lab to arrive at final design of both the hardware portion and the software portion to achieve the design objectives.

  Develope a strategic vision and sense of mission

Why is it important to develope a strategic vision and sense of mission before proceeding? Why is it important to politically know the key stakeholders and ensure they are in agreement before proceeding?

  Construct the series and parallel inductive reactive circuit

Discuss why it is often stated that inductors and capacitors are "dual" elements. Include similarities and differences that must be taken into account when performing calculations with each element and how these two elements are capable of exchang..

  How many grams of lead shot of density

A tin can has a total volume of 1300cm3 and a mass of 160 g. How many grams of lead shot of density 11.4 g/cm3 couldit carry without sinking in water?

  C program that displays your name and address

1.Convert the following to a do/while loop. It should produce exactly the same output.

  Write essay about robots will replace humans in their jobs

Write a research essay about if i believe that robots will replace humans in their jobs?

  Write a fully structural design for the given circuit

Barrel shifter is used in most of the high performance computing system. Write a fully structural design for the above circuit and simulate it for the correct functionality.

  C++ programming-math conversions

Each team (listed below) must create a C++ program which accomplishes the specified conversions or other duties as specified below. Use all that you have learned...including lessons learned from your exciting lab assignments, earlier mini-projects..

  Kinds of transistor circuits amplifying and switching

1. The bridge rectifier is similar to a full-wave rectifier .because it produces a full-wave output voltage.

  Prepare a report on tamping

Prepare a report on tamping - What is tamping and Working Components of tamping machine.

  Calculate the maximum bit rate

Using Shannons theorem,calculate the maximum bit rate that can be achieved on a fiber optical link with a signal to noise of 40db. The central wavelength of the light used is 850 nm wiht a band of 10 nm on either side.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd