Why is a length of about 1.25l bridge segment is constructed

Assignment Help Civil Engineering
Reference no: EM13542354

1.A compound highway curve to the right with both curves having interior angles of 45 degree, has an approach tangent of N45degreeE. What is the bearing of the tangent leaving the curves.

2. In incremental launching method of bridge construction, what are the measures adopted to enhance sufficient resistance of the superstructure during the launching process?

3.In designing concrete structures, normally maximum aggregate sizes are adopted with ranges from 10mm to 20mm. Does an increase of maximum aggregate size benefit the structures?

4.In the construction of a two-span bridge (span length = L) by using span-by-span construction, why is a length of about 1.25L bridge segment is constructed in the first phase of construction?

Reference no: EM13542354

Questions Cloud

Calculate the head loss in 500 m of pipe : Carbon dioxide flows in a 75 mm diameter PVC pipe at 0.014 kg/s at a pressure of 345 kN/m^2/s abs and a temperature of 10 degrees C. Calculate the head loss in 500 m of pipe.
Determine the actual distance below the surface at which : In the determination of the average velocity of flow in wide rivers, it is common practice to estimate the average velocity in a vertical section by making a single measurement at a distance below
Compute the required weight of the coarse : A concrete mix with a 3 inch slump, w/c (water content) ratio of 0.50, and sand with a fineness modulus of 2.4 contrains 1700 lb/cubic yard of coarse aggregate. Compute the required weight of the coarse
What are the measures adopted to enhance sufficient : In incremental launching method of bridge construction, what are the measures adopted to enhance sufficient resistance of the superstructure during the launching process?
Why is a length of about 1.25l bridge segment is constructed : In the construction of a two-span bridge (span length = L) by using span-by-span construction, why is a length of about 1.25L bridge segment is constructed in the first phase of construction?
What do you think is the best ratio of b/y to use in your : A canal of rectangular cross-section and an n=0.030 is to be laid on a slope of 0.002 and is to carry a discharge of 30 m3/s. Calculate the cross-sectional area required for the channel to carry this flow based on the norma
Determine the normal depth and critical depth in a trapezoid : Determine the normal depth and critical depth in a trapezoidal channel with a bottom width of 12.5 m, side slopes of 2:1, and a bed slope of 0.003 m/m.
Calculate the depth of water at each end of the tank : A rectangular tank 2.0m wide, 4m long, and 2m deep contains water to a depth of 1.0m It is accelerated horizontally at 3m/s^2 in the x direction.
Water is transferred at a rate of 2.1cfs from reservior : Water is transferred at a rate of 2.1cfs from an upper reservoir to a lower reservoir by a concrete pipe 3000ft long. The difference in water level is 60ft. Determine the size of pipe for a water temperature of 60 degrees Fahrenheit. Apply The Darcy-..

Reviews

Write a Review

 

Civil Engineering Questions & Answers

  Determine the work done by the gas on the bullet

Assuming the origin is placed where the bullet begins to move, the force (in newtons) exerted by the expanding gas on the bullet is 18000 + 7000x - 20000x2, where x is in meters.

  Calculate max capillary rise of water between 2 glass plates

Calculate the max capillary rise of water between 2 verticle glass plates spaced .25mm apart and the minimum capillary drop if the same plates are placed .25mm apart are in mercury

  Determine longitudinal and hoop stresses in the copper pipe

Typical water supply at a faucet in any building is conveyed in copper pipe that is ½" in inside diameter, with a wall thickness of 0.040". If the water pressure is 50 psi and the valve is closed (meaning that water is not flowing)

  Determine how much soil must be removed from the site

The minimum safe side slope for an excavation in a certain type of soil is 3 horizontal to 1 vertical. If a foundation excavation must be 40 ft wide x 60 ft long x 20 ft deep, How much soil must be removed from the site

  Calculate the ph of a 1-l solution containing sodium acetate

Calculate the pH of a 1-L solution containing 0.01 M sodium acetate after the addition of 3 mL 0.5 M H2SO4

  What are the moment vectors from f about a-b and c

A small blimp is temporarily moored wherein DC and the centerline of AB are coplanar. A force F from wind, weight, and buoyancy is shown acting at the centerline of the blimp. If F = 5i+ 10 j + 18 k kN

  Design a horizontal curve with a 40-degree central angle

Design a horizontal curve with a 40-degree central angle (delta=40) for a two-lane road with 11-ft lanes. The design speed is 70 mi/h and superelevation is limited to 0.06ft/ft. Give radius, degree of curvature, and length of curve.

  What is the detention time in the cstr

Assume the overall system is at steady-state, theflow rate is 15 L/min, the detention time is the PFR is 1.5 hours,and the decay rate of compound A is defined by a first-order ratereaction (k = 1 h-1).

  On a summer day when the wind speed in 3 ms a tank truck

on a summer day when the wind speed in 3 ms a tank truck loaded with liquid chlorine is involved in an accident that

  Calculate the height of the capillary rise in the tube

A clean glass capillary tube having a diameter of .008 in. was inserted into water with a surface tension of 0.00504 lb/ft. Calculate the height of the capillary rise in the tube.

  What is the relative humidity for the final mixed parcel

Two parcels of air are mixed. The given properties of the two parcels and the final mixed parcel are as follows: parcel (1): volume = 1 Liter, Temperature = 10 Celsius, pressure = 1 atm, relative humidity = 50%, parcel (2): volume 1 Liter, Tempera..

  1 an analysis of dredged sediments from a stormwater

1. an analysis of dredged sediments from a stormwater retention basin revealed a high concentration in mgkg of the

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!