Which has the lowest total cost of production

Assignment Help Project Management
Reference no: EM131410216

Triveni Steels (P) Ltd is planning to start a new factory for manufacturing steel utensils. It is considering three location options, namely Bokaro, Jamshedpur, and Bhilai.

The fixed costs at three locations have been estimated at Rs 8.15million, Rs 7.377million andRs 7.903, locations are million respectively. The variable costs allocations are estimated at Rs 500 per unit, 580 per unit and 490 per unit respectively.

The factory will have an annual production capacity of 10,000 steel utensils and in the initial years, it will operate at 75%efficiency. Find the best location option, Which has the lowest total cost of production.

Reference no: EM131410216

Questions Cloud

Initial value of the convertible energy for collision : A 7.45 g bullet is fired at a 4.0 kg wooden block hanging from a very light string. The bullet strikesthe stationary block at 360 m/s, and lodges in the wood. The bullet/block combination then swings upward to aheight h above its initial position.
Describe how you have compiled a list of suppliers : Describe how you have compiled a list of suppliers. What methodology did you use? What are the challenges you have encountered while trying to find potential suppliers?
What is the minimum deflection of the spring : A Pachinko machine launches a ball of mass m=0.03kg vertically through a loop of radius r=0.5m with vertical rise h=1m. The spring launcher is pulled down a distance of x=0.1 m. The spring constant is k= 100N/m. What is the minimum deflection of t..
What is the kinetic energy of the main part : (a) What is the total mechanical energy of the roller coaster/earth system at the 40m hilltop? (b) What is the kinetic energy of the roller coaster at the 5m dip? (c) What is the kinetic energy of the main part of the roller coaster at the 30m crest ..
Which has the lowest total cost of production : The factory will have an annual production capacity of 10,000 steel utensils and in the initial years, it will operate at 75%efficiency. Find the best location option, Which has the lowest total cost of production.
Calculate optimum quantities of products slack : Formulate the linear programming problem calculate optimum quantities of products slacks and total profit and also conduct sensitivity analysis accordingly using simplest method?
What are some negative consequences of false memories : What is the main point of the article?What do we know about memory and false memories from studies that use the "lost in the mall" procedure, according to Loftus?Why do we need studies that attempt to plant implausible or impossible memories?Loftus m..
Region where the potential energy has the form : A particle is in a region where the potential energy has the form U = 40 Jm2/x2. The particle startsout at rest at x = -0.1m. (a) Which way will it go, and why?
Should eloandocs continue with current model of designing : Should eLoanDocs continue with their current model of designing, building, and managing their own computer hosting infrastructure using their co-location partners?

Reviews

Write a Review

 

Project Management Questions & Answers

  Examine the various types of project risks

Analyze the project risk identification and assessment processes. Examine the various types of project risks. Use technology and information resources to research issues in managing project risk.

  Different project management models

Explain the value that each selected project management model offers to a project manager. Explain which project settings are ideal for their use. Use credible sources to support your arguments.

  Suggest an agile project management framework

Suggest an agile project management framework to your sponsors and justify the agile framework best suited for this project

  Critical path guarantee a successful project

Does managing to the critical path guarantee a successful project? Why or why not?

  Calculating variance for the project activities

Using the following project information, calculate the variance for each of the project activities.

  Discuss proposal planning and execution of a hcit project

Discuss the proposal, planning and execution of a HCIT project and the significance of these elements. Discuss the significance of proper planning in at least five project knowledge areas.

  Describe how random variation might affect content weight

In a manufacturing process, what is random variation? If cereal boxes are being filled by a machine, describe how random variation might affect the content weight of the individual boxes.

  What advice would you give the owners to raise productivity

Suppose you are the manager of the firm. What advice would you give the owners to raise the productivity of its labor? Be specific in your proposal.

  Which starting technique gives a better initial solution

Which starting technique generally gives a better initial solution, and why? - The more sources and destinations there are for a transportation problem, the smaller the percentage of all cells that will be used in the optimal solution. Explain.

  Team-based pm and team-based pm best practices

Show how a project team could be leveraged to solve a specific challenge you are facing in your position as an Administrator at work or in your academic life

  Find an example of a company that took a big risk on an

find an example of a company that took a big risk on an information technology project and succeeded. in addition find

  Project manager interface between business and technology

Explain the role of a project manager as an interface between business and technology professionals in an organization.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd