When does connection capacity govern the required strength

Assignment Help Civil Engineering
Reference no: EM13548105

1.When does connection capacity govern the required strength for Mechanical Stabilized earth wall reinforcement?

2.A person purchases a $5000, 5% per year bond, with interest payable semiannually. The bond has a maturity date of 10 years from now. How much the person must sell the bond for 6 years from now in order to make a rate of return of 10% per year, compounded semiannually is closest to

3.Border Steel invested $800,000 in a new shearing unit. At an interest rate of 10% per year, compounded quarterly, the quarterly income required to recover the investment in 3 years is closest to

4.The cost of tuition at a certain public university was $120 per credit-hour 7 years ago. The cost today (exactly 7 years later) is $255. The annual rate of increase is closest to

Reference no: EM13548105

Questions Cloud

Compute the disclosure and elevation of a : Steel design problem A w14X74 of A992 Steel has a length of 20 feet and fixed ends. Compute the design compressive strength for LRFD and the allowable compressive strength for ASD. please give solution step by step
The design conditions and shear strengths used for each : Explain, in some detail, the design conditions and shear strengths used for each design condition when working with clay soils?
Compute total stockholders equity for radial company : Compute total stockholders' equity for Radial Company - Equity Adjustments
Compute the year in which the gradient ends : The present worth of an increasing geometric gradient is $23,632. The interest rate is 10% per year, and the rate of change is 4% per year. If the cash flow amount in year 1 is $3000, compute the year in which the gradient ends?
When does connection capacity govern the required strength : The cost of tuition at a certain public university was $120 per credit-hour 7 years ago. The cost today (exactly 7 years later) is $255. The annual rate of increase is closest to
Determine the payback period for an asset that has a first : A construction company invested $60,000 in a new bulldozer. If the income from temporary leasing of the bulldozer is expected to be $15,000 per year, the length of time required to recover the investment at an interest rate of 15% per year is closest..
Compute the total restaurant sales : Compute the total restaurant sales, and the sales of each product line that would be necessary to achieve the desired target net income and calculate the total restaurant sales and the sales of each product line that would be necessary to achieve t..
Craete a single-step income statement : Prepare a multiple-step income statement, prepare a single-step income statement - In its income statement for the year ended December
Test your script with one or two functions : Create a flow chart, pseudo code, or other outline of the algorithm you need to implement. This will need to be turned in with your MATLAB code.

Reviews

Write a Review

Civil Engineering Questions & Answers

  Water is critical to the paper production process

Fresh water enters the process in 3 streams – approx. 0.5 ML/d enters with chemicals at the dry end of the machine, approx. 1 ML/d enters at the wet end of the machine and the boiler consumes approx. 0.2 ML/d.

  When do obnoxious odors appear

A dairy that processes about 250,000 lb of milk daily produces an average of 65,100 gpd of wastewater with a BOD of 1400 mg/L. The principal opearations are bottling milk and maing ice cream with limited produciton of cottage cheese.  What is the was..

  What is temperature in stream downstream of cooling tower

A discharge from a power plant cooling tower has a temperature of 81 degrees C and flows into the stream at a rate of 3 cubic meters per minute. What is the temperature in the stream downstream of the cooling tower discharge

  Calculate the average velocity of the flow leaving

Water enters a cylindrical tank through two pipes at rates of 250and 100 gal/min. If the level of water in the tank remains constant, calculate the average velocity of the flow leaving thetank through an 8-in. inside-diameter pipe.

  Find what is the fluid velocity ft per day in the aquifer

Two monitoring wells were constructed in an unconfined aquifer. The wells are separated by a distance of 250 ft. The water surface elevations in the up-gradient and down-gradient wells were 101.00 and 100.85 ft, respectively.

  What are the force and total time required

What is the weight of a 10-ft3 tank of oxygen if the oxygen is pressurized to 400 psia, the tank itself weighs 100 lbf, and thetemperature is 700F?

  Determine the collimation error e present in the

a. explain how the presence of the collimation error e can be detected in a two peg test operation.b. a b and c are

  Determine what volume of naocl will be needed

An electric power plant consumes 2.5 million gallons per day of cooling water. To control bacterial growth (slime), 2.0 mg/L of chlorine (measured as Cl2) is injected into the make-up water fed to the system.

  Question 1 a what are minerals sketch different types of

question 1 a what are minerals? sketch different types of mineral crystal forms and list different types of rock

  Design torsion reinforcement in rectangular and flanged beam

Write a user friendly computer program to design torsion reinforcement in rectangular and flanged beams, and plot the cross-sectional reinforcement details on a graphic plotter

  How to specify the number of plates that can be stored

A plate storage system for a self-serve salad bar in a restaurant. As plates are added to or withdrawn from the stack, the spring force and stiffness are such that the plates always protrude above the tabletop by about 60 mm.

  Find how much would the pressure in the tank increase

A rigid tank contains 5kg of water at 20 degrees Celsius. A gage on the tank reads 200kPa. Determine a) the volume of the tank, b) How much would the pressure in the tank increase if the temperature were increased to 50 degrees Celsius.

Free Assignment Quote

Assured A++ Grade

Get guaranteed satisfaction & time on delivery in every assignment order you paid with us! We ensure premium quality solution document along with free turntin report!

All rights reserved! Copyrights ©2019-2020 ExpertsMind IT Educational Pvt Ltd